Risk assessment on floating water photovoltaic power generation projects in China using the HFLTS-cloud model method

被引:1
|
作者
Sun X. [1 ]
机构
[1] School of Economics and Management, Xi'an University of Technology, Xi'an
关键词
analytic network process; ANP; cloud model; floating water PV power generation projects; fuzzy synthetic evaluation; hesitant fuzzy linguistic term sets; risk assessment;
D O I
10.1504/IJTPM.2024.139454
中图分类号
学科分类号
摘要
The risk assessment of floating water photovoltaic (PV) power generation is an important component of its project feasibility study. In order to assess the risk of low-carbon development of floating water PV plant projects, this paper firstly identifies 18 key criteria in economic, technical, environmental and management aspects; secondly, considering the uncertainty of the evaluation language and the fuzziness of the decision-making environment, this paper uses hesitant fuzzy linguistic term sets (HFLTS) to collect information, and uses analytic network process (ANP) to determine the weight of indicators, combined with fuzzy synthetic evaluation (FSE) method to build a risk assessment framework; thirdly, this paper conducts an empirical study on China, and verifies the effectiveness and applicability of the assessment model through comparative analysis. The results indicate that the risk level of floating water PV power projects in China is slightly high. Finally, corresponding risk response measures were proposed. Copyright © 2024 Inderscience Enterprises Ltd.
引用
收藏
页码:303 / 341
页数:38
相关论文
共 50 条
  • [1] Risk assessment of renewable energy-based island microgrid using the HFLTS-cloud model method
    Wu, Yunna
    Hu, Mengyao
    Liao, Mingjuan
    Liu, Fangtong
    Xu, Chuanbo
    JOURNAL OF CLEANER PRODUCTION, 2021, 284
  • [2] Investment risk evaluation of inland floating photovoltaic power plants in China using the HFLTS-TFN method
    Xiao, Yanli
    Ju, Xin
    Yu, Bo
    Wang, Zheng
    Xu, Chuanbo
    CLEAN ENERGY, 2021, 5 (03): : 536 - 550
  • [3] Risk Assessment on Offshore Photovoltaic Power Generation Projects in China Using D Numbers and ANP
    Zhou, Jie
    Su, Xiaoyan
    Qian, Hong
    IEEE ACCESS, 2020, 8 : 144704 - 144717
  • [4] Risk assessment on offshore photovoltaic power generation projects in China based on a fuzzy analysis framework
    Wu, Yunna
    Li, Lingwenying
    Song, Zixin
    Lin, Xiaoshan
    JOURNAL OF CLEANER PRODUCTION, 2019, 215 : 46 - 62
  • [5] Photovoltaic Power Generation Projects Investment Risk Analysis in Guizhou Province, China
    Jun, Liu
    Yong, Xiao
    Zeng, Huarong
    Wen, Xiankui
    Chen, Shijun
    Zeng, Peng
    2014 IEEE INTERNATIONAL CONFERENCE ON MECHATRONICS AND AUTOMATION (IEEE ICMA 2014), 2014, : 1411 - 1415
  • [6] Risk Assessment of Low-Speed Wind Power Projects Based on an Aggregated Cloud Method: A Case in China
    Wu, Yunna
    Ji, Shaoyu
    Wang, Jing
    Song, Zixin
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2018, 2018
  • [7] Risk Assessment of Water Environment Treatment PPP Projects Based on a Cloud Model
    Zhang, Yaqiong
    He, Nan
    Li, Yijing
    Chen, Yiyang
    Wang, Lei
    Ran, Yunlong
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2021, 2021
  • [8] Risk assessment of infrastructure REITs projects based on cloud model: a case study of China
    Wang, Yousong
    Gong, Enqin
    Zhang, Yangbing
    Yao, Yao
    Zhou, Xiaowei
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (11) : 4330 - 4352
  • [9] Risk assessment of wind-photovoltaic-hydrogen storage projects using an improved fuzzy synthetic evaluation approach based on cloud model: A case study in China
    Wu, Yunna
    Chu, Han
    Xu, Chuanbo
    JOURNAL OF ENERGY STORAGE, 2021, 38
  • [10] Risk assessment on photovoltaic power generation project by grey correlation analysis and TOPSIS method
    Li, Yanbin
    Yu, Xinyi
    Wang, Zhijie
    Dianwang Jishu/Power System Technology, 2013, 37 (06): : 1514 - 1519