共 12 条
[1]
Andreeva L.I., 2019, Gorn. Zh, V5, P92, DOI [10.21440/0536-1028-2019-5-92-106, DOI 10.21440/0536-1028-2019-5-92-106]
[2]
Chibukhchyan S.S., 2023, Gorn. Zh., P45, DOI [10.17580/gzh.2023.04.07, DOI 10.17580/GZH.2023.04.07]
[3]
Christiansen B., 2018, Exploring biggest maintenance challenges in the mining industry
[4]
Dunaev A.V., 2012, Remont. Vosstanovlenie. Modernizatsiya, P25
[5]
House R.J., 1996, Value dased leadership: An integrated theory and an emprical test (working paper)
[6]
Khazin M.L., 2019, Izv. Ural. Gorn. Univ, V133, P128, DOI [10.21440/2307-2091-2019-1-128-135, DOI 10.21440/2307-2091-2019-1-128-135]
[7]
Norris G., 2023, The true cost of unplanned equipment downtime
[8]
STUDY OF BEARING UNITS WEAR RESISTANCE OF ENGINES CAREER DUMP TRUCKS, WORKING IN FRETTING CORROSION CONDITIONS
[J].
JOURNAL OF MINING INSTITUTE,
2019, 235
:70-77
[9]
Ozornin S.P., 2023, Vestn. Zabaikalskogo Gos. Univ, V29, P21, DOI [10.21209/2227-9245-2023-29-21-30, DOI 10.21209/2227-9245-2023-29-21-30]
[10]
Pobegailo P. A., 2021, IOP Conference Series: Materials Science and Engineering, V1023, DOI 10.1088/1757-899X/1023/1/012021