Two-stage power system restoration model

被引:0
作者
Yang, Hong [1 ]
Tang, Zhen [1 ]
Wang, Wei [1 ]
Xue, Zhihang [2 ]
机构
[1] State Grid Shanxi Elect Power Res Inst, Taiyuan 030001, Peoples R China
[2] Xi An Jiao Tong Univ, Sch Elect Engn, Xian 710049, Peoples R China
来源
GLOBAL ENERGY INTERCONNECTION-CHINA | 2024年 / 7卷 / 06期
关键词
Black start; Energy storage; Renewable energy sources; OPTIMIZATION; RELIABILITY; SEQUENCE; NETWORK;
D O I
10.1016/j.gloei.2024.11.012
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
In response to the need for robust black-start strategies in modern smart grids during blackouts, this paper proposes a two-stage black-start model that integrates wind turbines (WT), photovoltaic generators (PV), and energy storage systems (ESS). The system restoration path model in the first stage utilizes the Dijkstra algorithm to create a skeleton network and formulate a post-outage generator start-up plan. The second stage involved a load pick-up model, structured as a mixed-integer linear programming problem, aimed at restoring the load with the assistance of the ESS. This stage was designed for computational efficiency, allowing solutions to be obtained using standard commercial solvers. The performance and efficacy of the proposed model were demonstrated through its application to modified IEEE 39/118-bus transmission systems, with the results affirming its high efficiency and effectiveness in power system restoration scenarios.
引用
收藏
页码:773 / 785
页数:13
相关论文
共 34 条
[1]   Renewable energy sources for complete optimal power system black-start restoration [J].
El-Zonkoly, Amany Mohamed .
IET GENERATION TRANSMISSION & DISTRIBUTION, 2015, 9 (06) :531-539
[2]   Incorporating Wind Energy in Power System Restoration Planning [J].
Golshani, Amir ;
Sun, Wei ;
Zhou, Qun ;
Zheng, Qipeng P. ;
Hou, Yunhe .
IEEE TRANSACTIONS ON SMART GRID, 2019, 10 (01) :16-28
[3]   Two-Stage Adaptive Restoration Decision Support System for a Self-Healing Power Grid [J].
Golshani, Amir ;
Sun, Wei ;
Zhou, Qun ;
Zheng, Qipeng P. ;
Tong, Jianzhong .
IEEE TRANSACTIONS ON INDUSTRIAL INFORMATICS, 2017, 13 (06) :2802-2812
[4]   Global optimisation model and algorithm for unit restarting sequence considering black-start zone partitioning [J].
Gu, Xueping ;
Zhou, Guangqi ;
Li, Shaoyan ;
Liu, Tong .
IET GENERATION TRANSMISSION & DISTRIBUTION, 2019, 13 (13) :2652-2663
[5]   Permutation-based Power System Restoration in Smart Grid Considering Load Prioritization [J].
Hou, Jia ;
Xu, Zhao ;
Dong, Zhao Yang ;
Wong, Kit Po .
ELECTRIC POWER COMPONENTS AND SYSTEMS, 2014, 42 (3-4) :361-371
[6]   Blackstart capability planning for power system restoration [J].
Jiang, Yazhou ;
Chen, Sijie ;
Liu, Chen-Ching ;
Sun, Wei ;
Luo, Xiaochuan ;
Liu, Shanshan ;
Bhatt, Navin ;
Uppalapati, Sunitha ;
Forcum, David .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2017, 86 :127-137
[7]   Optimal generation units start-up sequence during restoration of power system considering network reliability using bi-level optimization [J].
Ketabi, Abbas ;
Karimizadeh, Amin ;
Shahidehpour, Mohammad .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2019, 104 :772-783
[8]   Using Information-Theoretic Co-clustering for Power System Black-Start Decision Making with Incomplete Information [J].
Leng, Ya-Jun ;
Yue, Xin ;
Lu, Yi-Qin ;
Zhao, Shu-Ping .
ELECTRIC POWER COMPONENTS AND SYSTEMS, 2022, 49 (6-7) :573-583
[9]   Method for the Energy Storage Configuration of Wind Power Plants with Energy Storage Systems used for Black-Start [J].
Li, Cuiping ;
Zhang, Shining ;
Zhang, Jiaxing ;
Qi, Jun ;
Li, Junhui ;
Guo, Qi ;
You, Hongfei .
ENERGIES, 2018, 11 (12)
[10]   Optimization of loop-network reconfiguration strategies to eliminate transmission line overloads in power system restoration process with wind power integration [J].
Li, Shaoyan ;
Wang, Liyuan ;
Gu, Xueping ;
Zhao, Hanguang ;
Sun, Yongzhao .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2022, 134