共 33 条
- [1] LEI D M, GUO X P., A shuffled frog-leaping algorithm for job shop scheduling with outsourcing options [J], International Journal of Production Research, 54, 16, pp. 4793-4804, (2016)
- [2] ZHOU Xuecheng, Research on manufacturing resource sharing technology and platform development for mold processing [D], (2022)
- [3] LIU Yang, Research and implementation of order scheduling strategy based on intelligent optimization algorithm, (2021)
- [4] JIANG Xinyu, Research and implementation of industrial cluster information platform of mold city based on J2EE architecture [D], (2011)
- [5] ZHONG X L, FAN J, OU J W., Coordinated scheduling of the outsourcing, in-house production and distribution operations [J], European Journal of Operational Research, 302, 2, pp. 427-437, (2022)
- [6] TANG Wenna, LIU Le, Joint optimization of subcontractor options and single-machine batch scheduling [J], Computer System & Application, 31, 9, pp. 342-351, (2022)
- [7] LI Hui, WANG Xi, ZUO Zhiya, Multi-objective integrated optimization of flexible resource allocation and scheduling in the aerospace production workshop[J/OL], Chinese Journal of Management Science, pp. 1-17, (2023)
- [8] LI H, WANG X, PENG J B., A hybrid differential evolution algorithm for flexible job shop scheduling with outsourcing operations and job priority constraints[J], Expert Systems with Applications, 201, (2022)
- [9] SAFARZADEH H, KIANFAR F., Job shop scheduling with the option of jobs outsourcing[J], International Journal of Production Research, 57, 10, pp. 3255-3272, (2019)
- [10] LIU Le, Improved heuristic algorithm for a single-machine single-subcontractor scheduling and outsourcing integrated optimization problem [J], Operations Research and Management Science, 26, pp. 49-58, (2017)