Feasibility of biogas upgrading at a WWTP after pre-treatment application: Techno-economic assessment validation with pilot test data

被引:0
作者
Campo, Giuseppe [1 ]
Cerutti, Alberto [1 ]
Zanetti, Mariachiara [1 ]
Ruffino, Barbara [1 ]
机构
[1] Politecn Torino, Dept Environm Land & Infrastruct Engn, DIATI, Corso Duca Abruzzi 24, I-10129 Turin, Italy
关键词
Biogas upgrading; Waste activated sludge; membrane; Biological hydrolysis; Two-stage anaerobic digestion; Energy neutrality; PHASED ANAEROBIC-DIGESTION; WASTE ACTIVATED-SLUDGE; SYSTEM;
D O I
10.1016/j.jenvman.2024.122780
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Improving the efficiency of anaerobic digestion (AD) of sewage sludge (SS) is a critical step toward the achievement of energy neutrality in wastewater treatment plants (WWTPs), as required by the European Green Deal. This study used a comparative techno-economic assessment (TEA) to evaluate the feasibility of producing biomethane, at a WWTP, through upgrading biogas with a double-stage permeation membrane plant. The biogas was originally generated from the AD of a mixture of primary sludge (PS) and either raw or pre-treated waste activated sludge (WAS), where biological or thermo-alkali pre-treatments were applied to increase the WAS intrinsic low degradability. The TEA was supported by the results of pilot-scale tests, carried out on WAS, which mimicked (i) a traditional mesophilic AD process; (ii) a two-stage AD process, where a temperature-phased anaerobic digestion (TPAD, 3 days, 55 degrees C + 20 days, 38 degrees C) was performed to biologically pre-treat WAS; (iii) a traditional mesophilic AD process preceded by a thermo-alkali (4 g NaOH/100 g TS, 90 degrees C, 90 min) pre-treatment. The TEA was carried out in two phases. In the first, the minimum size of the WWTP capable of making the costs necessary for the implementation of the biogas upgrading plant equal to the revenues coming from selling biomethane (at 62 <euro>/MWh) in 10 years was calculated in the absence of pre-treatments. It resulted of 500,000 equivalent inhabitants (e.i.). In the second phase, for the WWTP size found previously, the effect of either biological or thermo-alkali pre-treatments on the economic balance was evaluated, that is the gain (or the loss) associated to the selling of biomethane, compared to the reference price of 62 <euro>/MWh. It was found that the TPAD increased the biogas productivity by only 23.6%, too little to compensate the amount of heat necessary for the pre-treatment and the purchase cost of the additional reactor. Conversely, the thermo-alkali pre-treatment, which enhanced the WAS biogas productivity by 110%, increased the biomethane revenues by approx. 10 <euro>/MWh, compared to the scenario without pre-treatments. This study offers useful data to WWTP managers who want to introduce WAS pre-treatments, combined with interventions for biogas upgrading, in a new or existing sludge line of a WWTP.
引用
收藏
页数:11
相关论文
共 52 条
  • [1] American Public Health Association (APHA), 2012, Standard Methods for the Examination of Water and Wastewater, V22nd ed.
  • [2] [Anonymous], 2022, Rapporto Rifiuti Speciali-Edizione
  • [3] Biogas-to-biomethane upgrading: A comparative review and assessment in a life cycle perspective
    Ardolino, F.
    Cardamone, G. F.
    Parrillo, F.
    Arena, U.
    [J]. RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2021, 139
  • [4] Benchmarking environmental and economic indicators of sludge management alternatives aimed at enhanced energy efficiency and nutrient recovery
    Arias, A.
    Feijoo, G.
    Moreira, M. T.
    [J]. JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2021, 279
  • [5] Characterising and modelling free ammonia and ammonium inhibition in anaerobic systems
    Astals, S.
    Peces, M.
    Batstone, D. J.
    Jensen, P. D.
    Tait, S.
    [J]. WATER RESEARCH, 2018, 143 : 127 - 135
  • [6] Bianchini Augusto, 2016, International Journal of Environment and Waste Management, V18, P226, DOI 10.1504/IJEWM.2016.080795
  • [7] Feasibility analysis for reduction of carbon footprint in a wastewater treatment plant
    Borzooei, Sina
    Campo, Giuseppe
    Cerutti, Alberto
    Meucci, Lorenza
    Panepinto, Deborah
    Ravina, Marco
    Riggio, Vincenzo
    Ruf, Barbara
    Scibilia, Gerardo
    Zanetti, Mariachiara
    [J]. JOURNAL OF CLEANER PRODUCTION, 2020, 271 (271)
  • [8] businessanalytiq, 2024, Price Index
  • [9] A modelling approach for the assessment of energy recovery and impact on the water line of sludge pre-treatments
    Campo, Giuseppe
    Cerutti, Alberto
    Zanetti, Mariachiara
    De Ceglia, Margherita
    Scibilia, Gerardo
    Ruffino, Barbara
    [J]. ENERGY, 2023, 274
  • [10] Water-Energy Nexus in the Antofagasta Mining District: Options for Municipal Wastewater Reuse from a Nearly Energy-Neutral WWTP
    Campo, Giuseppe
    Ruffino, Barbara
    Reyes, Arturo
    Zanetti, Mariachiara
    [J]. WATER, 2023, 15 (06)