共 28 条
[1]
LI Y L, LI X Y, GAO L., Review on hybrid flow shop scheduling problems, China Mechanical Engineering, 31, 23, pp. 2798-2813, (2020)
[2]
HAOUARI M, HIDRI L, GHARBI A., Optimal scheduling of a two-stage hybrid flow shop, Mathematical Methods of Operations Research, 64, 1, pp. 107-124, (2006)
[3]
MOCCELLIN J V, NAGANO M S, NETO A R P, Et al., Heuristic algorithms for scheduling hybrid flow shops with machine blocking and setup times, Journal of the Brazilian Society of Mechanical Sciences and Engineering, 40, 2, (2018)
[4]
LEI D M, SU B., A multi-class teaching-learning-based optimization for multi-objective distributed hybrid flow shop scheduling, Knowledge-Based Systems, 263, (2023)
[5]
QIN H X, HAN Y Y, ZHANG B, Et al., An improved iterated greedy algorithm for the energy-efficient blocking hybrid flow shop scheduling problem, Swarm and Evolutionary Computation, 69, (2022)
[6]
SCHULZ S, NEUFELD J S, BUSCHER U., A multi-objective iterated local search algorithm for comprehensive energy-aware hybrid flow shop scheduling, Journal of Cleaner Production, 224, pp. 421-434, (2019)
[7]
ZHOU N, ZHANG S L, ZHANG C., Discrete sparrow search algorithm incorporating rough data-deduction for solving hybrid flow-shop scheduling problems, Journal of Beijing University of Aeronautics and Astronautics, 50, 2, pp. 398-408, (2024)
[8]
WU X L, SUN Y J., A green scheduling algorithm for flexible job shop with energy-saving measures, Journal of Cleaner Production, 172, pp. 3249-3264, (2018)
[9]
REN C L, ZHANG C Y, MENG L L, Et al., Hybrid flow-shop scheduling problems based on improved migrating birdsoptimization algorithm, Computer Integrated Manufacturing Systems, 25, 3, pp. 643-653, (2019)
[10]
GENG K F, YE C M., Joint scheduling of machines and AGVs in green hybrid flow shop with missing operations, Control and Decision, 37, 10, pp. 2723-2732, (2022)