Rumsfeld's Heuristic: A Metaphor for Understanding the Knowns and Unknowns of Rework in Construction

被引:2
作者
Love P.E.D. [1 ]
Matthews J. [2 ]
Ika L.A. [3 ]
Fang W. [4 ]
机构
[1] Curtin University, School of Civil and Mechanical Engineering, Perth, 6845, WA
[2] Deakin University Geelong Waterfront Campus, School of Architecture and Built Environment, Geelong, 3220, VIC
[3] University of Ottawa, Telfer School of Management, Ottawa, KIN 6N5, ON
[4] Huazhong University of Science and Technology, School of Civil and Hydraulic Engineering, Wuhan
来源
IEEE Engineering Management Review | 2024年 / 52卷 / 01期
关键词
Construction; knowledge; nonconformance; quality; rework; unknown;
D O I
10.1109/EMR.2023.3322626
中图分类号
学科分类号
摘要
Poor quality in construction often manifests in the need for rework to be performed. Yet, no specific theory exists in the literature to provide practical guidance to mitigate rework. While common conceptualizations of rework abound, they fall short of the strict empirical testing required to develop a 'good' theory. Rumsfeld's heuristic suggests that within complex production systems such as construction, there are known knowns, known unknowns, and unknown unknowns. Using this heuristic as a metaphor, we undertake a narrative review of the literature to make sense of what is known, determine the key unsolved problems, and identify issues that research has failed to consider about rework in this article. Our article questions prevailing knowledge and aims to stimulate richer and more in-depth lines of inquiry to make headway toward developing a theory that explains rework causation. The much-needed theory would provide a platform for designing and developing effective strategies for mitigating rework in construction. This article's contributions are twofold as: (1) it identifies unresolved issues stymieing the ability to address rework effectively; and (2) promulgates new avenues of inquiry to create an improved understanding of the rework phenomenon, thus setting the foundation for sparking theoretical development. © 1973-2011 IEEE.
引用
收藏
页码:43 / 59
页数:16
相关论文
共 89 条
  • [1] Abdul-Rahman H., The cost of non-conformance during a highway project:A case study, ConstructionManagement and Economics, 13, 1, pp. 23-32, (1995)
  • [2] Abdul-Rahman H., Thompson P.A., Whyte I.L., Capturing the cost of non-conformance on construction sites:An application of the quality cost matrix, International Journal of Quality & Reliability Management, 13, 1, pp. 48-60, (1996)
  • [3] Changing the Game:How Australian Can Achieve Success in the NewWorld of Mega-projects.Australian Constructors Association, (2017)
  • [4] Asadi R., Wilkinson S., Rotimi J.O.B., Towards contracting strategy usage for rework in construction projects:A comprehensive review, ConstructionManagement and Economics, 39, 12, pp. 953-971, (2021)
  • [5] Asadi R., Rotimi J.O.B., Wilkinson S., Analysing underlying factors of rework in generating contractual claims in construction projects, ASCE Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 14, 1, (2023)
  • [6] Asadi R., Rotimi J.O.B., Wilkinson S., Analysing underlying factors of rework in generating contractual claims in construction projects, ASCE Journal of Construction, Engineering, and Management, 149, 6, (2023)
  • [7] Barber P., Sheath D., Tomkins C., Graves A., Quality failures in civil engineering, International Journal of Quality and Reliability Management, 17, 4-5, pp. 479-492, (2000)
  • [8] Burati J.L., Farrington J.J., Ledbetter W.B., Causes of quality deviations in design and construction, ASCE Journal of Construction Engineering and Management, 118, 1, pp. 34-49, (1992)
  • [9] The Field Rework Index:EarlyWarning for Field Rework and Cost Growth.Report No.RS153-1, (2001)
  • [10] Making Zero Rework A Reality.Report No.RS 203-1, (2005)