Contractor's checklist for quality control of integrally colored concrete flatwork

被引:0
|
作者
机构
来源
Aberdeens Concr Constr | / 4卷 / 372-374期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [1] TIPS ON INTEGRALLY COLORED CONCRETE.
    Buehrer, Richard
    1600, (32):
  • [2] Integrally colored tilt-up concrete
    Chusid, Michael
    Concrete Producer, 17 (08):
  • [3] Discover Integrally Colored Tilt-Up Concrete
    Paris, Nick
    Chusid, Michael
    Concrete International, 2000, 22 (08) : 37 - 40
  • [4] CONTRACTOR QUALITY-CONTROL
    HOHNS, HM
    JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1977, 103 (02): : 306 - 307
  • [5] CONTRACTOR QUALITY-CONTROL
    DEAN, JC
    CARR, RI
    MEYER, WL
    JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1976, 102 (03): : 535 - 546
  • [6] Ensuring the quality of colored concrete finishes
    Paris, Nick
    Chusid, Michael
    Construction Specifier, 1998, 51 (13):
  • [7] CONTRACTOR QUALITY-CONTROL - REPLY
    ALLRED, JH
    JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1977, 103 (03): : 548 - 548
  • [8] CONTRACTOR QUALITY CONTROL - 1.
    Rosen, Harold J.
    Progressive Architecture, 1972, (11):
  • [9] CONTRACTOR QUALITY CONTROL - AN EVALUATION.
    Isaak, Merlyn
    Journal of the Construction Division, 1982, 108 (CO4): : 481 - 484
  • [10] CONTRACTOR QUALITY-CONTROL - AN EVALUATION
    ISAAK, M
    JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1982, 108 (04): : 481 - 484