Robot assembly design and planning oriented integrated frame

被引:0
|
作者
Wei, C.Q.
Yang, R.Q.
Zhang, W.J.
Dun, X.M.
机构
来源
Jiqiren/Robot | 2001年 / 23卷 / 03期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [21] Object-oriented design of product assembly feature data requirements in advanced assembly planning
    Khabbazi, Mahmood Reza
    Wikander, Jan
    Onori, Mauro
    Maffei, Antonio
    ASSEMBLY AUTOMATION, 2018, 38 (01) : 97 - 112
  • [22] An integrated design framework for driver/passenger-oriented trajectory planning
    Li, L
    Wang, FY
    2003 IEEE INTELLIGENT TRANSPORTATION SYSTEMS PROCEEDINGS, VOLS. 1 & 2, 2003, : 1764 - 1769
  • [23] Assembly oriented design - economic assembly
    Baessler, Rudolf
    VDI-Z, 1988, 130 (08): : 18 - 23
  • [24] Integrated Process Planning and Resource Allocation for Collaborative Robot Workplace Design
    Fechter, Manuel
    Seeber, Carsten
    Chen, Shengjian
    51ST CIRP CONFERENCE ON MANUFACTURING SYSTEMS, 2018, 72 : 39 - 44
  • [25] Integrated task sequence planning and assignment for human-robot collaborative assembly station
    Wang, Yichen
    Wang, Junfeng
    Feng, Jindan
    Liu, Jinshan
    Liu, Xiaojun
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2023, 35 (04) : 979 - 1006
  • [26] Assembly planning and evaluation oriented assembly feature modeling
    Chang, Xiang-Qing
    Ning, Ru-Xin
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2001, 7 (12): : 35 - 38
  • [27] Single and multi-robot task planning and execution in a sensor integrated assembly cell
    Deb, SR
    Biswal, BB
    Dutta, AK
    Debnath, SK
    Das, A
    CAD/CAM ROBOTICS AND FACTORIES OF THE FUTURE, 1996, : 236 - 241
  • [28] Integrated planning for product module selection and assembly line design/reconfiguration
    Xu, Z.
    Liang, M.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (11) : 2091 - 2117
  • [29] Integrated part and assembly planning
    Grewal, S
    1997 IEEE INTERNATIONAL SYMPOSIUM ON ASSEMBLY AND TASK PLANNING (ISATP'97) - TOWARDS FLEXIBLE AND AGILE ASSEMBLY AND MANUFACTURING, 1997, : 36 - 41
  • [30] PLANNING OF A PERSONNEL ORIENTED ASSEMBLY SYSTEM
    VAHNING, H
    WELLER, B
    WERKSTATTSTECHNIK ZEITSCHRIFT FUR INDUSTRIELLE FERTIGUNG, 1984, 74 (01): : 43 - 46