STEPWISE PARTIAL ENUMERATION ALGORITHM FOR THE ECONOMIC LOT SCHEDULING PROBLEM.

被引:0
|
作者
Park, Kyung S. [1 ]
Yun, Deok K. [1 ]
机构
[1] Korea Advanced Inst of Science &, Technology, Seoul, South Korea, Korea Advanced Inst of Science & Technology, Seoul, South Korea
关键词
ALGORITHM PERFORMANCE - MULTIPRODUCT SINGLE FACILITY - SUFFICIENT FEASIBILITY TEST;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:363 / 370
相关论文
共 50 条
  • [1] A STEPWISE PARTIAL ENUMERATION ALGORITHM FOR THE ECONOMIC LOT SCHEDULING PROBLEM
    PARK, KS
    YUN, DK
    IIE TRANSACTIONS, 1984, 16 (04) : 363 - 370
  • [2] New Algorithm for Economic Lot Scheduling Problem
    Luo, Rongwu
    PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON LOGISTICS SYSTEMS AND INTELLIGENT MANAGEMENT, VOLS 1-3, 2010, : 334 - 337
  • [3] A Differential Evolution Algorithm for the Economic Lot Scheduling Problem
    Tasgetiren, M. Fatih
    Bulut, Onder
    Fadiloglu, M. Murat
    2011 IEEE SYMPOSIUM ON DIFFERENTIAL EVOLUTION (SDE), 2011, : 157 - 162
  • [4] Hybrid genetic algorithm for the economic lot-scheduling problem
    Moon, I
    Silver, EA
    Choi, S
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (04) : 809 - 824
  • [5] A tabu search algorithm for solving economic lot scheduling problem
    Raza, S. A.
    Akgunduz, A.
    Chen, M. Y.
    JOURNAL OF HEURISTICS, 2006, 12 (06) : 413 - 426
  • [6] A genetic algorithm for solving the economic lot scheduling problem with reworks
    Chang, Yu-Jen
    Yao, Ming-Jong
    PROCEEDINGS OF THE EIGHTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2009, 8 : 294 - 306
  • [7] A tabu search algorithm for solving economic lot scheduling problem
    S. A. Raza
    A. Akgunduz
    M. Y. Chen
    Journal of Heuristics, 2006, 12
  • [8] A genetic algorithm for solving economic lot size scheduling problem
    Sarker, R
    Newton, C
    COMPUTERS & INDUSTRIAL ENGINEERING, 2002, 42 (2-4) : 189 - 198
  • [9] A GENETIC ALGORITHM FOR SOLVING THE ECONOMIC LOT SCHEDULING PROBLEM WITH REWORKS
    Chang, Yu-Jen
    Yao, Ming-Jong
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2009, 26 (05) : 411 - 425
  • [10] An artificial bee colony algorithm for the economic lot scheduling problem
    Bulut, Onder
    Tasgetiren, M. Fatih
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (04) : 1150 - 1170