共 50 条
[41]
A LARGER VERSION OF CANDU DESIGNED FOR WORLD MARKETS
[J].
NUCLEAR ENGINEERING INTERNATIONAL,
1981, 26 (314)
:43-52
[42]
Telecontrol of Mining Machinery: Reflections after 16 Years of Underground Experience. Examination of Two Major Problems.
[J].
Industrie minerale. Mine,
1979, (05)
:325-330
[43]
OPERATING EXPERIENCE - REPORTS FROM WORLD NUCLEAR POWER STATION SITES.
[J].
1600, (21)
:242-243
[47]
Operating Experience with PUR-Insulated Plastic-Sheathed Pipes in Odense-Denmark.
[J].
Fernwarme international,
1980, 9 (01)
:23-26
[48]
Commissioning of the Kii-channel HVDC link - Application of new HVDC technology and operating experience
[J].
IEE Conf Publ,
1600, 485 (214-219)
[49]
CANDU MAN-MACHINE INTERFACE AND SIMULATOR TRAINING.
[J].
Atomic Energy of Canada Limited, AECL (Report),
1982,