ENGINEERING GEOLOGY AND MINING.

被引:0
|
作者
Rankilor, Peter R.
机构
来源
Ground Engineering | 1976年 / 9卷 / 07期
关键词
MINERAL EXPLORATION - MINES AND MINING;
D O I
暂无
中图分类号
学科分类号
摘要
Since the rate at which mechanical engineering adjustment can be made within a project is slow, the engineering geologist must be able to provide ample warning of variation from expected conditions. This is a critical on-stream function which must be fulfilled effectively in order to maintain a state of high working efficiency. The article discusses various aspects of this function, including data acquisition, input to the pre-planning and planning stages, data feedback during operations, and completion of extraction.
引用
收藏
页码:22 / 26
相关论文
共 50 条