共 50 条
- [42] Construction of westinghouse AP1000™ nuclear power plants in China Int Conf Nucl Eng Proc ICONE, (303-309):
- [43] Condensate Polishing in Nuclear Power Plants with Boiling Water Reactors. VGB Kraftwerkstechnik, 1979, 59 (03): : 199 - 202
- [44] Proceedings of the American Nuclear Society - International Congress on Advances in Nuclear Power Plants 2005, ICAPP'05 Proc. Am. Nucl. Soc. Int. Congr. Adv. Nucl. Power Plants,
- [46] The computation of radiation exposure in the vicinity of nuclear power plants with the aid of the remote monitoring system for nuclear reactors Kerntechnik und Atompraxis, 1978, 20 (07): : 312 - 317
- [47] ADMINISTRATIVE CONTROLS AND QUALITY ASSURANCE FOR THE OPERATIONAL PHASE OF NUCLEAR POWER PLANTS. American National Standards Institute, Standards, 1976,
- [48] Strength Analysis of Vertical Flow Steam Generators of Nuclear Power Plants. Mechanika Teoretyczna i Stosowana, 1981, 19 (02): : 217 - 224
- [49] Calculation of the Duration of the Technological Cycle of Manufacture of Equipment for Nuclear Power PLants. 1978, (05): : 29 - 31
- [50] UPGRADING OF QUALITY ASSURANCE PROGRAMMATIC GUIDANCE FOR OPERATING NUCLEAR-POWER PLANTS NUCLEAR SAFETY, 1982, 23 (03): : 277 - 281