Alarm Management in Cement Plants - A Modernization Problem.

被引:0
|
作者
Sedlmeir, W.
机构
来源
ZKG international | 1987年 / 40卷 / 03期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
5
引用
收藏
页码:150 / 156
相关论文
共 50 条
  • [11] Modernization of the management and protection of small hydropower plants
    Cierny, Jozef
    Pospisil, Jaroslav
    PROCEEDINGS OF THE IVTH INTERNATIONAL SCIENTIFIC SYMPOSIUM ON ELECTRIC POWER ENGINEERING - ELEKTROENERGETIKA 2007, 2007, : 482 - +
  • [13] II. Communication on the detector problem. (The electrolytic problem.)
    Reissaus, GG
    PHYSIKALISCHE ZEITSCHRIFT, 1928, 29 : 655 - 658
  • [14] Alarm management practices in natural gas processing plants
    Soares, Vinicius Barroso
    Pinto, Jose Carlos
    de Souza, Mauricio Bezerra, Jr.
    CONTROL ENGINEERING PRACTICE, 2016, 55 : 185 - 196
  • [15] Alarm management approach for supervision of Green Hydrogen Plants
    Vasquez-Capacho, J. W.
    Perez-Zuniga, G.
    Rodriguez-Urrego, L.
    JOURNAL OF CLEANER PRODUCTION, 2024, 477
  • [16] Management of detached plumes in cement plants
    Miller, FM
    IEEE-IAS/PCA 2001 CEMENT INDUSTRY TECHNICAL CONFERENCE - CONFERENCE RECORD, 2001, : 301 - 311
  • [17] Trends in the performance management of cement plants
    Harder, Joachim
    ZKG INTERNATIONAL, 2014, 67 (05): : 36 - 43
  • [18] THE PROBLEM OF GASEOUS EMISSIONS OF MERCURY IN CEMENT PLANTS
    WEISWEILER, W
    KELLER, A
    ZEMENT-KALK-GIPS, 1992, 45 (10): : 529 - 532
  • [19] Trends in the performance management of cement plants
    Harder, J., 1600, Bauverlag BV GmbH (67):
  • [20] The wage problem.
    Heidebroek, E
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1921, 65 : 165 - 169