共 50 条
[22]
Minimizing Total Weighted Completion Time on a Single Machine Scheduling Problem with Resumable Jobs and Flexible Maintenance
[J].
ICRAI 2018: PROCEEDINGS OF 2018 4TH INTERNATIONAL CONFERENCE ON ROBOTICS AND ARTIFICIAL INTELLIGENCE -,
2018,
:34-39
[23]
Single Machine Scheduling Problem With a Weight-Modifying-Activity to Minimize the Total Weighted Completion Time
[J].
IEEE Access,
2022, 10
:45444-45456
[24]
Rolling horizon procedures for the single machine deterministic total completion time scheduling problem with release dates
[J].
Annals of Operations Research,
(70)
[25]
Rolling horizon procedures for the single machine deterministic total completion time scheduling problem with release dates
[J].
Annals of Operations Research,
1997, 70
:115-125
[30]
On-line scheduling of a single machine to minimize total weighted completion time
[J].
PROCEEDINGS OF THE THIRTEENTH ANNUAL ACM-SIAM SYMPOSIUM ON DISCRETE ALGORITHMS,
2002,
:548-557