NIGORIKAWA GEOTHERMAL PILOT PLANT.

被引:0
|
作者
Nakamoto, Yassunobu
机构
来源
Energy developments in Japan | 1980年 / 2卷 / 04期
关键词
Compendex;
D O I
暂无
中图分类号
学科分类号
摘要
ELECTRIC POWER PLANTS
引用
收藏
页码:301 / 317
相关论文
共 50 条
  • [1] Selective Flotation in an Automated Pilot Plant.
    Bakinov, K.G.
    Lapshina, Z.G.
    Mesyachnikova, V.P.
    Shtabov, Yu.V.
    Tsvetnye Metally, 1978, (01): : 72 - 75
  • [2] PRELIMINARY ECONOMIC AND PROCESS ANALYSIS OF A MULTIPURPOSE GEOTHERMAL DESALTING POWER PLANT.
    Fritzler, Eugene A.
    Coury, Glenn E.
    Whipple, John L.
    Esquivel, Cato
    NWSIA journal, 1980, 7 (02): : 27 - 38
  • [3] Benson Test Plant.
    Hein, D.
    Keil, H.
    Koehler, W.
    VGB Kraftwerkstechnik, 1977, 57 (06): : 369 - 374
  • [4] OPTIMISING POWDER PLANT.
    Hughes, J.F.
    Finishing, 1982, 6 (07): : 15 - 16
  • [5] Automated Feedwater Treatment Plant.
    Aleinikov, G.I.
    Gerzon, V.M.
    Yurchevskii, E.B.
    Minos'yan, V.A.
    Energomashinostroenie, 1980, (01): : 25 - 27
  • [6] PLANNING A TELEPHONE SYSTEM FOR THE PLANT.
    Epstein, Jack I.
    Garber, Joseph R.
    Plant Engineering (Barrington, Illinois), 1979, 33 (21): : 133 - 134
  • [7] UPGRADING YOUR FILTRATION PLANT.
    LaFontaine, E.O.
    1973, 111 (08): : 16 - 19
  • [8] RELIABILITY AND AVAILABILITY OF ESSENTIAL PLANT.
    Davies, David B.
    1977, : 1 - 5
  • [9] Corrosion Control in the CIRENE Plant.
    Conte, A.
    Di Pietro, R.
    Energia Nucleare (Milan), 1976, 23 (10): : 493 - 506
  • [10] NOISE REDUCTION IN QUARRY PLANT.
    Askloff, Sature
    Pit and Quarry, 1975, 68 (03): : 101 - 103