共 50 条
- [41] REACTOR OPERATOR TRAINING PROGRAMS UTILIZING NUCLEAR POWER PLANT SIMULATORS. 1600, Int At Energy Agency (Proc Ser, STI/PUB/351), Vienna, Austria
- [43] Problems of Construction of a Thermonuclear Power Plant Based on a Pulse Reactor with a Cumulating Liner. Trudy LPI, 1981, (374): : 84 - 89
- [44] Contract-Related Dosage Determination in the Biblis Nuclear Power Plant of the RWE. Atom und Strom, 1979, 25 (03): : 69 - 71
- [45] RECENT ORIENTATION OF NON-DESTRUCTIVE INSPECTION FOR NUCLEAR POWER PLANT COMPONENTS. FAPIG (First Atomic Power Industry Group), 1982, (101): : 15 - 20
- [46] Measurement of Steam Humidity in the Separator of the Turbine Unit of the Kola Nuclear Power Plant. Teploenergetika, 1980, (05): : 55 - 56
- [47] Standardized Low-pressure Surface Preheaters for Nuclear Power Plant Turbines. Teploenergetika, 1982, (05): : 39 - 43
- [48] INDUSTRIAL HEATING AND COOLING FROM STORED SPENT NUCLEAR POWER PLANT FUEL. Industrial Heating, 1980, 47 (11): : 30 - 32
- [49] STOCHASTIC EVALUATION OF THE DYNAMIC RESPONSE AND THE CUMULATIVE DAMAGE OF NUCLEAR POWER PLANT PIPING. Memoirs of Faculty of Technology, Tokyo Metropolitan University, 1980, (30): : 2879 - 2896
- [50] Tomography of the 2011 Iwaki earthquake (M 7.0) and Fukushima nuclear power plant area Solid Earth, 1 (43-51):