共 50 条
- [41] Remote Control or Monitoring of Automatic Transformer Substation Operation. Energietechnik Leipzig, 1980, 30 (01): : 11 - 15
- [43] Effect of the Pulverized Fuel Preparation System on Superheater Operation. 1978, (08): : 38 - 39
- [47] ROSARIO DOMINICANA'S CYANIDE TAILINGS DAM CONSTRUCTION AND OPERATION. ASTM Special Technical Publication, 1980,
- [48] IDENTIFICATION OF ROCK FOUNDATION DEFORMABILITY OF A LARGE ARCH DAM IN OPERATION. Buletinul Stiintific - Institutul de Constructii, Bucuresti, 1981, 24 (1-2): : 45 - 64
- [49] BURDEN TESTING AND ITS APPLICATION TO BLAST-FURNACE OPERATION. Journal of the Iron and Steel Institute (London), 1973, 211 (Part 2): : 106 - 114
- [50] MULTIPLEXED INFORMATION AND CONTROL SYSTEM FOR AN MSV: CONFIGURATION, INSTALLATION, AND OPERATION. Proceedings of the Annual Offshore Technology Conference, 1980, 2 : 181 - 189