共 50 条
- [41] Considerations on the Advantages of Supplementary Firing Systems for the Preheaters and Grates of Rotary Cement Kiln Plants. [J]. Zement-Kalk-Gips, 1975, 28 (07): : 281 - 284
- [42] DIGITAL CONTROL SYSTEM FOR COAL-FIRED POWER PLANTS. [J]. Hitachi Review, 1980, 29 (06): : 313 - 316
- [43] MODERN MAN-MACHINE SYSTEMS FOR THERMAL POWER PLANTS. [J]. Hitachi Review, 1986, 35 (05): : 275 - 278
- [44] Qualification of inspection systems in nuclear power plants. Looking for excellence [J]. e-Journal of Nondestructive Testing, 2024, 29 (11):
- [45] Fission Product Flow Control Instrument in Nuclear Power Plants. [J]. Atom und Strom, 1974, 20 (11-12): : 115 - 121
- [47] Advantages of Augmented Unit Capacities of Gas Pumping Plants. [J]. Energomashinostroenie, 1980, (02): : 4 - 8
- [48] Denitrification at the Bewag Power Plants. [J]. Elektrizitatswirtschaft, 1987, 86 (12): : 512 - 521
- [50] Computer Aided Dimensioning of Hydraulic Plants. [J]. Maschinenbautechnik, 1986, 35 (09): : 388 - 391