Lesotho highlands scheme: Construction begins

被引:0
作者
Anon
机构
来源
International Water Power and Dam Construction | 1989年 / 41卷 / 05期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:48 / 52
相关论文
共 50 条
[21]   Controls on basalt terrace formation in the eastern Lesotho highlands [J].
Grab, S ;
van Zyl, C ;
Mulder, N .
GEOMORPHOLOGY, 2005, 67 (3-4) :473-485
[22]   "In common nature": an ethnography of climate adaptation in the Lesotho Highlands [J].
Palframan, Andrea .
LOCAL ENVIRONMENT, 2015, 20 (12) :1531-1546
[23]   Schistosomiasis surveillance associated with the Lesotho Highlands Water Project [J].
Kravitz, J ;
Collins, R ;
Nyaphisi, M ;
Mandel, R ;
Petersen, E .
SOUTH AFRICAN MEDICAL JOURNAL, 1998, 88 (04) :470-471
[24]   The Lesotho Highlands Water Project gains international recognition [J].
Zipparro, Vincent ;
Sundaram, Archivok ;
Scheel, Dietmar .
Water and Wastewater International, 2005, 20 (03) :25-27
[25]   Basalt pseudokarst development in the Lesotho Highlands, southern Africa [J].
Knight, Jasper ;
Grab, Stefan W. .
QUATERNARY INTERNATIONAL, 2022, 611 :29-40
[26]   The Delivery Tunnel North, Lesotho Highlands Water Project [J].
De Graaf P.J.H. ;
Bell F.G. .
Geotechnical & Geological Engineering, 1997, 15 (2) :95-120
[27]   Investigation and design of the access roads for the Lesotho Highlands projects [J].
Anon .
Civil engineer in South Africa, 1988, 30 (11)
[28]   The Delivery Tunnel North, Lesotho Highlands Water Project [J].
P.J.H. De Graaf ;
F.G. Bell .
Geotechnical & Geological Engineering, 1997, 15 (2) :95-120
[29]   Lesotho Highlands: the socio-economics of exporting water [J].
Tromp, Leon .
PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 2006, 159 (05) :44-49
[30]   Can economy save the Lesotho Highlands water project? [J].
Blanchon, D .
HOUILLE BLANCHE-REVUE INTERNATIONALE DE L EAU, 2003, (03) :154-158