The article describes the background to the current work on the development of rolled concrete for dam construction. The proposed method consists of the formation of the faces of the dam using an offset slip-form paver running on top of the previously compacted hearting concrete. The hearting concrete is placed in layers of uniform thickness compatible with the slip-formed facing unit.
机构:
Nova Hut Klementa Gottwalda, Ostrava, Czech, Nova Hut Klementa Gottwalda, Ostrava, CzechNova Hut Klementa Gottwalda, Ostrava, Czech, Nova Hut Klementa Gottwalda, Ostrava, Czech
Harok, Milan
Jenik, Vladimir
论文数: 0引用数: 0
h-index: 0
机构:
Nova Hut Klementa Gottwalda, Ostrava, Czech, Nova Hut Klementa Gottwalda, Ostrava, CzechNova Hut Klementa Gottwalda, Ostrava, Czech, Nova Hut Klementa Gottwalda, Ostrava, Czech
Jenik, Vladimir
Sotola, Frantisek
论文数: 0引用数: 0
h-index: 0
机构:
Nova Hut Klementa Gottwalda, Ostrava, Czech, Nova Hut Klementa Gottwalda, Ostrava, CzechNova Hut Klementa Gottwalda, Ostrava, Czech, Nova Hut Klementa Gottwalda, Ostrava, Czech
机构:
Tsinghua Univ, Dep of Automation, China, Tsinghua Univ, Dep of Automation, ChinaTsinghua Univ, Dep of Automation, China, Tsinghua Univ, Dep of Automation, China
Dong, Mingchui
Ching Hua Ta Hsueh Hsueh Pao/ Journal of Ching Hua University,
1984,
24
(04):
: 90
-
102