Framework for an interactive project scheduling system under limited resources

被引:0
|
作者
Bogazici Univ, Bebek Istanbul, Turkey [1 ]
机构
来源
Eur J Oper Res | / 2卷 / 362-375期
关键词
Algorithms - Constraint theory - Optimization - Performance - Resource allocation - Scheduling;
D O I
暂无
中图分类号
学科分类号
摘要
A framework is proposed for an interactive project scheduling system under limited resources. The framework includes a modelling module (MODEL) and a scheduling module (SCHEDULER). The modelling module MODEL allows the Decision Maker (DM) to develop his/her own model. The SCHEDULER is developed on a constraint-based scheduling algorithm. An important feature of the system is that the project plan can be updated by performing the least modification of future commitments. It is possible to freeze the activities already scheduled in the near future while admitting the changes in the activity/network information.
引用
收藏
相关论文
共 50 条
  • [41] Project scheduling under partially renewable resources and resource consumption during setup operations
    Okubo, Hironori
    Miyamoto, Toshiyuki
    Yoshida, Satoshi
    Mori, Kazuyuki
    Kitamura, Shoichi
    Izui, Yoshio
    COMPUTERS & INDUSTRIAL ENGINEERING, 2015, 83 : 91 - 99
  • [42] A heuristic maintenance scheduling framework for a military aircraft fleet under limited maintenance capacities
    Zhang, Qin
    Liu, Yu
    Xiahou, Tangfan
    Huang, Hong-Zhong
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2023, 235
  • [43] Optimal sensor scheduling for two linear dynamical systems under limited resources in sensor networks
    Wang, Jie
    Qin, Jiahu
    Ma, Qichao
    Kang, Yu
    Fu, Xinxin
    NEUROCOMPUTING, 2018, 273 : 101 - 110
  • [44] Concept for an Interactive Project Scheduling and Control System for Civil Engineering and Building Construction.
    Dressler, Joachim
    Paulson Jr., Boyd C.
    Baumaschine und Bautechnik, 1975, 22 (05): : 145 - 151
  • [45] Project scheduling with flexible resources: formulation and inequalities
    Isabel Correia
    Lídia Lampreia Lourenço
    Francisco Saldanha-da-Gama
    OR Spectrum, 2012, 34 : 635 - 663
  • [46] Complexity of Project Scheduling Problem with Nonrenewable Resources
    Servakh, Vladimir V.
    Shcherbinina, Tatyana A.
    OPERATIONS RESEARCH PROCEEDINGS 2007, 2008, : 427 - +
  • [47] Project scheduling with flexible resources: formulation and inequalities
    Correia, Isabel
    Lourenco, Lidia Lampreia
    Saldanha-da-Gama, Francisco
    OR SPECTRUM, 2012, 34 (03) : 635 - 663
  • [48] Toward interactive scheduling systems for managing medical resources
    Oddi, A
    Cesta, A
    ARTIFICIAL INTELLIGENCE IN MEDICINE, 2000, 20 (02) : 113 - 138
  • [49] Project scheduling under competition
    Averbakh, I
    Lebedev, V
    NAVAL RESEARCH LOGISTICS, 2005, 52 (06) : 481 - 492
  • [50] THE SALEM PROJECT - POLITICS, RESOURCES, FRAMEWORK
    SPRATT, MJ
    PARTNERSHIPS IN PARKS & PRESERVATION : PROCEEDINGS AND BIBLIOGRAPHY, 1991, : 89 - 92