Framework for an interactive project scheduling system under limited resources

被引:0
|
作者
Bogazici Univ, Bebek Istanbul, Turkey [1 ]
机构
来源
Eur J Oper Res | / 2卷 / 362-375期
关键词
Algorithms - Constraint theory - Optimization - Performance - Resource allocation - Scheduling;
D O I
暂无
中图分类号
学科分类号
摘要
A framework is proposed for an interactive project scheduling system under limited resources. The framework includes a modelling module (MODEL) and a scheduling module (SCHEDULER). The modelling module MODEL allows the Decision Maker (DM) to develop his/her own model. The SCHEDULER is developed on a constraint-based scheduling algorithm. An important feature of the system is that the project plan can be updated by performing the least modification of future commitments. It is possible to freeze the activities already scheduled in the near future while admitting the changes in the activity/network information.
引用
收藏
相关论文
共 50 条
  • [22] Optimal sensor scheduling for state estimation under limited channel resources
    Li, Yao
    Zhu, Shanying
    Chen, Cailian
    Guan, Xinping
    Le, Xinyi
    JOURNAL OF THE FRANKLIN INSTITUTE-ENGINEERING AND APPLIED MATHEMATICS, 2023, 360 (17): : 14075 - 14097
  • [23] A framework for an automated and integrated project scheduling and management system
    Chen, Shih-Ming
    Griffis, F. H.
    Chen, Po-Han
    Chang, Luh-Maan
    AUTOMATION IN CONSTRUCTION, 2013, 35 : 89 - 110
  • [24] A resources scheduling decision support system for concurrent project management
    Nkasu, MM
    Leung, KH
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (11) : 3107 - 3132
  • [25] ALTERNATIVE RESOURCES IN PROJECT SCHEDULING
    LI, RKY
    WILLIS, RJ
    COMPUTERS & OPERATIONS RESEARCH, 1991, 18 (08) : 663 - 668
  • [26] Client-Contractor Bargaining on Net Present Value in Project Scheduling with Limited Resources
    Kavlak, Nursel
    Ulusoy, Guenduez
    Serifoglu, Funda Sivrikaya
    Birbil, S. Ilker
    NAVAL RESEARCH LOGISTICS, 2009, 56 (02) : 93 - 112
  • [27] Toward Reducing Construction Project Delivery Time under Limited Resources
    Mohamed, Hossam H.
    Ibrahim, Ahmed H.
    Soliman, Asmaa A.
    SUSTAINABILITY, 2021, 13 (19)
  • [28] A scatter search algorithm for project scheduling under partially renewable resources
    Alvarez-Valdes, R
    Crespo, E
    Tamarit, JM
    Villa, F
    JOURNAL OF HEURISTICS, 2006, 12 (1-2) : 95 - 113
  • [29] A scatter search algorithm for project scheduling under partially renewable resources
    R. Alvarez-Valdes
    E. Crespo
    J. M. Tamarit
    F. Villa
    Journal of Heuristics, 2006, 12 : 95 - 113
  • [30] GRASP and path relinking for project scheduling under partially renewable resources
    Alvarez-Valdes, R.
    Crespo, E.
    Tamarit, J. M.
    Villa, F.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 189 (03) : 1153 - 1170