FAST FORM STRIPPING SPEEDS ERECTION OF HIGH-LEVEL CONCRETE BOX GIRDER BRIDGE.

被引:0
作者
Drossel, Margaret Ralston
机构
来源
Construction Methods and Equipment | 1977年 / 59卷 / 05期
关键词
BRIDGES; CONCRETE; -; Construction;
D O I
暂无
中图分类号
学科分类号
摘要
The author reports how a stripping system that lowers soffit formwork in 75-ft-long segments is the key to a cantilevered balanced tee erection scheme that makes it possible to cut time off the schedule in construction of a prestressed concrete box girder bridge.