共 50 条
- [3] A way for flow-shop scheduling when time buffer is considered PROCEEDINGS OF '97 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, 1997, : 324 - 328
- [5] A Hardware Architecture for the Branch and Bound Flow-Shop Scheduling Algorithm 2015 NORDIC CIRCUITS AND SYSTEMS CONFERENCE (NORCAS) - NORCHIP & INTERNATIONAL SYMPOSIUM ON SYSTEM-ON-CHIP (SOC), 2015,
- [6] A modified branch and bound algorithm for a vague flow-shop scheduling problem IRANIAN JOURNAL OF FUZZY SYSTEMS, 2019, 16 (04): : 55 - 64
- [7] A branch and bound procedure for the reentrant permutation flow-shop scheduling problem The International Journal of Advanced Manufacturing Technology, 2006, 29 : 1186 - 1193
- [9] A branch and bound procedure for the reentrant permutation flow-shop scheduling problem INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 29 (11-12): : 1186 - 1193
- [10] A branch and bound procedure for the reentrant permutation flow-shop scheduling problem International Journal of Advanced Manufacturing Technology, 2006, 29 (11-12): : 1186 - 1193