Deepwater well-control system

被引:0
|
作者
机构
来源
| 1600年 / Society of Petroleum Engineers (SPE)卷 / 57期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
(Edited Abstract)
引用
收藏
相关论文
共 50 条
  • [32] Considerations for conducting coiled-tubing well-control operations to minimize formation impairment
    Sas-Jaworsky, A
    Ghalambor, A
    SPE PRODUCTION & FACILITIES, 2002, 17 (04): : 241 - 250
  • [33] Dynamic Simulation Platform Aids Deep Transient Tests, Well-Control Safety
    Ashraf Abu Talib, M.
    Shahril Ahmad Kassim, M.
    Marzuki, Izral Izarruddin
    JPT, Journal of Petroleum Technology, 2024, 76 (02): : 66 - 68
  • [34] Dynamic well-control response to gas influx in managed-pressure drilling
    1600, Society of Petroleum Engineers (SPE) (65):
  • [35] UNIVERSITY USES ON-CAMPUS ABANDONED WELL TO SIMULATE DEEP-WATER WELL-CONTROL OPERATIONS
    BOURGOYNE, AT
    OIL & GAS JOURNAL, 1982, 80 (22) : 138 - 141
  • [36] SIMULATING THE FINANCIAL COST OF A DEEPWATER LOSS OF WELL CONTROL
    Black, Jared L.
    Hinrichsen, Eckhard
    Zenteno, Alfredo Tello
    PROCEEDINGS OF THE ASME 32ND INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING - 2013, VOL 2A, 2013,
  • [37] DEEPWATER WELL CONTROL OFFERS COMPLEX OPTIONS.
    Bruce, George H.
    Warriner, Richard A.
    Oil and Gas Journal, 1984, 82 (26): : 92 - 104
  • [38] Joint well-placement and well-control optimization for energy-efficient water flooding of oil fields
    Angga, I. Gusti Agung Gede
    Bergmo, Per Eirik Strand
    Berg, Carl Fredrik
    GEOENERGY SCIENCE AND ENGINEERING, 2023, 230
  • [39] Ultradeepwater hydraulics and well-control tests with extensive instrumentation: Field tests and data analysis
    Rommetveit, R
    Bjorkevoll, KS
    Gravdal, JE
    Goncalves, CJC
    Lage, ACVM
    Campos, JEA
    Aragao, AFL
    Arcelloni, A
    Ohara, S
    SPE DRILLING & COMPLETION, 2005, 20 (04) : 251 - 257
  • [40] Well-control procedures for dual-gradient drilling as compared to conventional riser drilling
    Schubert, Jerome J.
    Juvkam-Wold, Hans C.
    Choe, Jonggeun
    SPE Drilling and Completion, 2006, 21 (04): : 287 - 295