DESIGN AND OPERATION EXPERIENCE OF 1,090 MW COMBINED PLANT.

被引:0
|
作者
Edahiro, K. [1 ]
机构
[1] Mitsubishi Heavy Industries Ltd, Mitsubishi Heavy Industries Ltd
关键词
CONTROL SYSTEMS - ELECTRIC EQUIPMENT - INSPECTION - WASTE HEAT UTILIZATION;
D O I
暂无
中图分类号
学科分类号
摘要
Gas and steam turbine combined power plant design and operation are described. The plant configuration and major equipment are presented along with the plant's performance.
引用
收藏
页码:14 / 21
相关论文
共 50 条
  • [1] Intraoperative Device Closure of Isolated Ventricular Septal Defects: Experience on 1,090 Cases
    Chen, Qiang
    Hong, Zhi-Nuan
    Zhang, Gui-Can
    Chen, Liang-Wan
    Zhang, Qi-Liang
    Lin, Ze-Wei
    Cao, Hua
    ANNALS OF THORACIC SURGERY, 2018, 105 (06): : 1797 - 1802
  • [2] AN APPRAISAL OF CHLORPROMAZINE - GENERAL-PRINCIPLES FOR ADMINISTRATION OF CHLORPROMAZINE, BASED ON EXPERIENCE WITH 1,090 PATIENTS
    WINKELMAN, NW
    AMERICAN JOURNAL OF PSYCHIATRY, 1957, 113 (11): : 961 - 971
  • [3] DESIGN AND OPERATION OF PURE CO RECOVERY PLANT.
    Fujita, Tsuneo
    Sakuraya, Toshikazu
    Koizumi, Susumu
    Sasaki, Yozo
    Umeki, Masakazu
    Matsui, Shigeo
    1600, (26):
  • [4] DEVELOPMENT OF 1 MW CENTRALIZED PV POWER PLANT.
    Takahashi, M.
    Hosokawa, H.
    Takeda, Y.
    Takigawa, K.
    Conference Record of the IEEE Photovoltaic Specialists Conference, 1984, : 1031 - 1035
  • [5] Operating Experience with Pipework and Valves in the Bexbach 750 MW Power Plant.
    Rost, M.
    VGB-Kraftwerkstechnik, 1987, 67 (08): : 786 - 803
  • [6] EXPERIENCE GAINED IN OPERATION OF INDUCTION CRUCIBLE FURNACES AT THE BAKU' ″ELEKTROTSENTROLIT″ PLANT.
    Zadaev, R.R.
    Efimov, A.A.
    Soviet electrical engineering, 1981, 52 (07): : 27 - 30
  • [7] FIRST EXPERIENCE GAINED DURING THE OPERATION OF THE BOTTROP COAL OIL PLANT.
    Wolowski, E.
    Hosang, H.
    Erdoel und Kohle, Erdgas, Petrochemie vereinigt mit Brennstoff-Chemie, 1983, 36 (08): : 373 - 376
  • [8] Experience of Operation of District Heating Installations at the Beloyarskayh Nuclear Power Plant.
    Boldyrev, V.M.
    Kireev, G.A.
    Poddubnyi, G.I.
    Sheinkman, A.G.
    Teploenergetika, 1978, (06): : 17 - 20
  • [9] STATUS OF THE CONSTRUCTION OF THE THTR-300 Mw AND THE DESIGN OF A 500 Mw FOLLOW-ON PLANT.
    Wittchow, G.
    Baust, E.
    Schoening, J.
    1600, (78):
  • [10] DESIGN OF AN INTEGRATED COAL GASIFICATION COMBINED-CYCLE PLANT.
    Mezzedimi, V.
    Quaderni Pignone, 1980, (30): : 13 - 18