ON SERVER ALLOCATION IN MULTIPLE CENT MANUFACTURING SYSTEMS.

被引:0
|
作者
Shanthikumar, George J. [1 ]
Yao, David D. [1 ]
机构
[1] Univ of California, Berkeley, CA,, USA, Univ of California, Berkeley, CA, USA
来源
Operations Research | 1988年 / 36卷 / 02期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
PROBABILITY
引用
收藏
页码:333 / 342
相关论文
共 50 条
  • [1] ON SERVER ALLOCATION IN MULTIPLE CENTER MANUFACTURING SYSTEMS
    SHANTHIKUMAR, JG
    YAO, DD
    OPERATIONS RESEARCH, 1988, 36 (02) : 333 - 342
  • [2] NOTE ON MARGINAL ALLOCATION IN MULTIPLE-SERVER SERVICE SYSTEMS
    ROLFE, AJ
    MANAGEMENT SCIENCE SERIES A-THEORY, 1971, 17 (09): : 656 - 658
  • [3] ETHERNET SERVER FOR AMS SYSTEMS.
    Igelbrink, Christoph
    Siemens components English ed., 1987, 22 (06): : 244 - 247
  • [4] ADVANCED MANUFACTURING SYSTEMS.
    Spur, Guenter
    Robotics and Computer-Integrated Manufacturing, 1985, 4 (1-2) : 7 - 12
  • [5] CELLULAR MANUFACTURING SYSTEMS.
    Sinha, R.K.
    Hollier, R.H.
    Grayson, T.J.
    Chartered Mechanical Engineer, 1980, 27 (11): : 40 - 41
  • [6] MODELLING MANUFACTURING SYSTEMS.
    Buzacott, J.A.
    Robotics and Computer-Integrated Manufacturing, 1985, 2 (01) : 25 - 32
  • [7] DISTRIBUTED MANUFACTURING SYSTEMS.
    Weston, R.H.
    Sumpter, C.M.
    Gascoigne, J.D.
    Robotica, 1986, 4 (pt 1) : 15 - 26
  • [8] FEASIBILITY CUT GENERATION BY SIMULATION: SERVER ALLOCATION IN SERIAL-PARALLEL MANUFACTURING SYSTEMS
    Zhang, Mengyi
    Matta, Andrea
    Alfieri, Arianna
    Pedrielli, Giulia
    2019 WINTER SIMULATION CONFERENCE (WSC), 2019, : 3633 - 3644
  • [9] WORK FLOW IN MANUFACTURING SYSTEMS.
    Dale, B.G.
    Engineering management international, 1984, 3 (01): : 3 - 13
  • [10] ROBOTS IN FLEXIBLE MANUFACTURING SYSTEMS.
    Boubekri, Nourredine
    Robotics Amsterdam, 1987, 3 (3-4): : 421 - 426