共 50 条
- [41] OPEN-PIT PLANNING AND SELECTIVE MINING PRACTICES AT THE NEW-CELEBRATION-GOLD-MINE GOLD FORUM ON TECHNOLOGY AND PRACTICES - WORLD GOLD 89, 1989, : 139 - 146
- [43] Haul distance prediction algorithm of discrete block in open-pit mine planning stage Meitan Xuebao/Journal of the China Coal Society, 2019, 44 (04): : 1098 - 1106
- [47] INFLUENCE OF THE HUMAN FACTOR ON RISKS IN AN OPEN-PIT MINE STRUCTURAL INTEGRITY AND LIFE-INTEGRITET I VEK KONSTRUKCIJA, 2015, 15 (02): : 117 - 128
- [50] ON THE MECHANISM AND PROCESS OF SLOPE DEFORMATION IN AN OPEN-PIT MINE ROCK MECHANICS, 1981, 13 (03): : 145 - 156