共 50 条
- [31] MANUFACTURING PRECISION OF MEANDERING DELAY SYSTEMS. Telecommunications and Radio Engineering (English translation of Elektrosvyaz and Radiotekhnika), 1974, 28-29 (10): : 96 - 101
- [34] Methodological Analysis of Informational Needs for Military Systems. Revue technique - Thomson-CSF, 1979, 11 (03): : 751 - 767
- [35] GUIDELINES CLARIFY BACKUP NEEDS IN UPS SYSTEMS. Electronic Systems Technology and Design/Computer Design's, 1985, 24 (07): : 129 - 130
- [36] SICOMP WS WORKSTATIONS IN INTEGRATED MANUFACTURING SYSTEMS. Siemens Power Engineering & Automation, 1985, 7 (05): : 320 - 322
- [37] SIMULATION FOR DESIGN AND SCHEDULING OF FLEXIBLE MANUFACTURING SYSTEMS. Technical Paper - Society of Manufacturing Engineers. MS, 1982,
- [38] ROBOTIC ASSEMBLY & COMPUTER INTEGRATED MANUFACTURING SYSTEMS. Technical Paper - Society of Manufacturing Engineers. MS, 1982,
- [39] ORGANISATIONAL CHARACTERISTICS OF GROUP TECHNOLOGY MANUFACTURING SYSTEMS. Production Engineer (London), 1975, 54 (10): : 551 - 554
- [40] ON SERVER ALLOCATION IN MULTIPLE CENT MANUFACTURING SYSTEMS. Operations Research, 1988, 36 (02): : 333 - 342