THE CENTRAL ARTERY PROJECT - CONSTRUCTION TECHNIQUES

被引:0
|
作者
Sholock, Francis R.
机构
来源
American Society of Civil Engineers, Transportation Engineering Journal | 1980年 / 106卷 / 02期
关键词
Compendex;
D O I
暂无
中图分类号
学科分类号
摘要
TUNNELS AND TUNNELING
引用
收藏
页码:205 / 215
相关论文
共 24 条
  • [21] Construction management considerations and techniques used to microtunnel a new sewer main under Pacific Coast Highway for the City of Santa Monica
    Schroeder, F.J.
    Lowell, Susan
    Eberts, Ralph T.
    Wilson, Monte L.
    Parker, Chuck R.
    New Pipeline Technol. Secur. Saf., 1600, (1666-1674):
  • [22] The cross river rail project as a PPP model in Brisbane, Australia. Experiences in cavern construction for 3 underground stations and tunnelling with double shield machines
    Wayss and Freytag Ingenieurbau AG, Frankfurt am Main, Germany
    Tunn. Better Life - Proc. World Tunn. Congr., (3243-3248):
  • [23] Closure to Responses of streamflow to climate variability and hydraulic project construction in Wudaogou Basin, Northeast China by Xinguo Sun, Yong Peng, Huicheng Zhou, and Xiaoli Zhang
    School of Engineering Management, Huaiyin Institute of Technology, Huaian
    223030, China
    不详
    116024, China
    不详
    450045, China
    J. Hydrol. Eng., 4
  • [24] A public domain model for 1D temperature and rheology construction in basement-sedimentary geothermal exploration: an application to the Spanish Central System and adjacent basins
    Limberger, J.
    Bonte, D.
    de Vicente, G.
    Beekman, F.
    Cloetingh, S.
    van Wees, J.D.
    Acta Geodaetica et Geophysica, 2017, 52 (02): : 269 - 282