Denitrification at the Bewag Power Plants.

被引:0
作者
Bers, Konstantin [1 ]
Ehnert, Guenther [1 ]
Michel, Bernhard [1 ]
Wilken, Reinhard [1 ]
机构
[1] Berliner Kraft- und Licht (Bewag)-AG, Berlin, West Ger, Berliner Kraft- und Licht (Bewag)-AG, Berlin, West Ger
来源
Elektrizitatswirtschaft | 1987年 / 86卷 / 12期
关键词
ENVIRONMENTAL PROTECTION;
D O I
暂无
中图分类号
学科分类号
摘要
With the implementation of primary measures for wet-bottom boilers and the termination of pilot tests for secondary denitrification, the Bewag has completed the first phase of the denitrification of its power plants. In the second phase, which will be concluded by 1990, further measures will be put into operation to fulfill the requirements of the environment conference of April 5, 1984 for coal and oil boilers, as well as the regulations of the TA-atmosphere for gas turbine plants.
引用
收藏
页码:512 / 521
相关论文
empty
未找到相关数据