Denitrification at the Bewag Power Plants.

被引:0
|
作者
Bers, Konstantin [1 ]
Ehnert, Guenther [1 ]
Michel, Bernhard [1 ]
Wilken, Reinhard [1 ]
机构
[1] Berliner Kraft- und Licht (Bewag)-AG, Berlin, West Ger, Berliner Kraft- und Licht (Bewag)-AG, Berlin, West Ger
来源
Elektrizitatswirtschaft | 1987年 / 86卷 / 12期
关键词
ENVIRONMENTAL PROTECTION;
D O I
暂无
中图分类号
学科分类号
摘要
With the implementation of primary measures for wet-bottom boilers and the termination of pilot tests for secondary denitrification, the Bewag has completed the first phase of the denitrification of its power plants. In the second phase, which will be concluded by 1990, further measures will be put into operation to fulfill the requirements of the environment conference of April 5, 1984 for coal and oil boilers, as well as the regulations of the TA-atmosphere for gas turbine plants.
引用
收藏
页码:512 / 521
相关论文
共 50 条
  • [1] Utilization of By-Products from the Bewag Power Plants.
    Bruehl, Bettina
    Pokojski, Martin
    Schmelzer, Joachim
    1600, (86):
  • [2] DIESEL POWER PLANTS.
    Hanselmann, H.U.
    Koeppen, M.
    Brown Boveri review, 1981, 68 (10-11): : 398 - 404
  • [3] Industrial Power Plants.
    Wantke, J.
    Elin-Zeitschrift, 1976, 28 (04): : 165 - 174
  • [4] SOLAR THERMAL POWER PLANTS.
    Moustafa, S.M.A.
    1986, : 356 - 369
  • [5] Incidents in Nuclear Power Plants.
    Copic, Milan
    Dusic, Milorad
    Elektrotehniski Vestnik/Electrotechnical Review, 1987, 54 (1-2): : 31 - 34
  • [6] FLASHED STEAM POWER PLANTS.
    Guiza L, Jorge
    Welding Journal (Miami, Fla), 1973, : 39 - 43
  • [7] Maintenance of Nuclear Power Plants.
    Leclercq, Jacques
    Revue de l'Energie, 1985, 36 (371): : 80 - 87
  • [8] Recirculation Cooling in Power Plants.
    Beck, Peter
    Goettling, Dieter H.
    1600, (02):
  • [9] COAL BLENDING AT POWER PLANTS.
    Mahr, Daniel
    1600, (85):
  • [10] ECONOMICS OF WIND POWER PLANTS.
    Foellings, F.J.
    Pfeiffer, A.E.
    1600, (27): : 1 - 3