共 50 条
- [22] Propagation of the Smoke Plume During Operation of a Thermal Power Plant. Teploenergetika, 1979, (03): : 33 - 37
- [23] Control of Turbine with Two Steam Bleedings for a Peaking Power Plant. Teploenergetika, 1980, (10): : 39 - 41
- [25] PRELIMINARY ECONOMIC AND PROCESS ANALYSIS OF A MULTIPURPOSE GEOTHERMAL DESALTING POWER PLANT. NWSIA journal, 1980, 7 (02): : 27 - 38
- [26] Experiences Gained from a Coupled Electricity-Heat Power Plant. Energie, 1977, 29 (11): : 376 - 379
- [27] Investigation of the Waterwall System of the TGMP-240 800 MW Monoblock of the Zaporozhe State District Power Plant. Teploenergetika, 1979, (12): : 38 - 42
- [29] Synthesis of an Optimal System of Control of a Closed-Circle Plant. Izvestiya Vysshikh Uchebnykh Zavedenii, Gornyi Zhurnal, 1973, (05): : 148 - 153