共 13 条
- [3] TOWER ERECTION FOR THE 380 kV ELBE CROSSING OF NORDWESTDEUTSCHE KRAFTWERKE AG. Siemens Power Engineering, 1979, 1 (05): : 160 - 163
- [4] Determination of Crane Cycle Times when Used in the Erection of Precast Concrete Units. Bauzeitung (Berlin), 1973, 27 (11): : 581 - 582
- [5] BUCKLING OF REINFORCED CONCRETE COOLING TOWER SHELLS - BSS APPROACH. 1982, V 79 (N 5): : 387 - 391
- [7] INVESTIGATION OF CONSTRUCTION FAILURE OF REINFORCED CONCRETE COOLING TOWER AT WILLOW ISLAND, WV. National Bureau of Standards, Building Science Series, 1982,
- [9] The simulation analysis method for reinforced concrete tower climbing formwork construction under environmental factors Dongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Southeast University (Natural Science Edition), 2024, 54 (05): : 1105 - 1114