共 50 条
- [42] U. S. OPERATORS DRILL 439 DEEP WELLS IN '76. Petroleum Engineer International, 1977, 49 (03): : 25 - 29
- [43] ANALYSIS OF METHODS FOR LEASING THE U. S. OUTER CONTINENTAL SHELF. JPT, Journal of Petroleum Technology, 1980, 32 (07): : 1262 - 1270
- [44] U. S. AND WORLD ENERGY OUTLOOK - IMPLICATIONS FOR THE ALUMINUM INDUSTRY. Journal of Metals, 1981, 33 (06): : 141 - 144
- [45] JAMES BAY AHEAD OF SCHEDULE: PROVIDES FOR POWER EXPORT TO U. S. Power Engineering (Barrington, Illinois), 1981, 85 (04): : 98 - 101
- [46] INTRODUCTION TO U. S. - JAPAN COOPERATIVE EARTHQUAKE ENGINEERING PROGRAM. Publication SP - American Concrete Institute, 1985, : 1 - 10
- [47] TRIANGULAR GRID SYSTEM FRAMES LARGEST WOOD DOME IN THE U. S. Engineering News-Record, 1976, 197 (26):
- [50] TECHNOLOGY TEAMWORK - M. O. S. AND BIPOLAR. Electronic Engineering (London), 1975, 47 (563): : 55 - 58