MINE VENTILATION SYSTEM WITH AUTOMATICALLY EXCHANGEABLE ACTIVE PARTS.

被引:0
|
作者
Benger, H.-F. [1 ]
机构
[1] Brown, Boveri & Co, Essen, West, Ger, Brown, Boveri & Co, Essen, West Ger
来源
| 1600年 / 73期
关键词
Compendex;
D O I
暂无
中图分类号
学科分类号
摘要
MINE VENTILATION
引用
收藏
相关论文
共 3 条
  • [1] ECL ACCELERATES TO NEW SYSTEM SPEEDS WITH HIGH-DENSITY BYTE-SLICE PARTS.
    Chu, Paul
    Electronics, 1979, 52 (16): : 120 - 125
  • [2] Fault source diagnosis for ventilation system and air velocity transducer placement in Daming Mine
    Pan, Jing-Tao
    Zhao, Dan
    Li, Zong-Xiang
    Gao, Kun
    Chen, Zhan-Jun
    Meitan Xuebao/Journal of the China Coal Society, 2013, 38 (SUPPL.1): : 153 - 158
  • [3] An optimization method of mine ventilation system based on R2 index hybrid multi-objective equilibrium optimization algorithm
    Yu, Bao-cai
    Shao, Liang-shan
    Energy Reports, 2022, 8 : 11003 - 11021