Extending the load range of the TGMP-114 boiler and 300 MW generating unit under conditions of variable-pressure operation

被引:0
|
作者
Mysak, I.S. [1 ]
Kuskov, I.A. [1 ]
Botvinov, V.P. [1 ]
Gerasimov, V.V. [1 ]
Zankovich, V.L. [1 ]
Zhadzilko, M.I. [1 ]
Miron, D.T. [1 ]
Sytnikova, N.M. [1 ]
机构
[1] Belgorod Polytechnic Inst, Russia
关键词
Load Range Extension - Load Reduction - TGMP-114 Boiler - Variable Pressure Operation;
D O I
暂无
中图分类号
学科分类号
摘要
(Edited Abstract)
引用
收藏
页码:321 / 326
相关论文
共 19 条
  • [1] EXTENDING THE LOAD RANGE OF THE TGMP-114 BOILER AND 300 MW GENERATING-UNIT UNDER CONDITIONS OF VARIABLE-PRESSURE OPERATION
    MYSAK, IS
    KUSKOV, IA
    BOTVINOV, VP
    GERASIMOV, VV
    ZANKOVICH, VL
    ZHADZILKO, MI
    MIRON, DT
    SYTNIKOVA, NM
    THERMAL ENGINEERING, 1988, 35 (06) : 321 - 326
  • [2] INTRODUCTION OF OIL COMBUSTION IN TGMP-114 BOILER OF A 300 MW UNIT
    GRISHIN, AD
    KAPELSON, LM
    KRUGLOV, BI
    PANCHENK.VF
    THERMAL ENGINEERING, 1972, 19 (02) : 26 - 29
  • [3] Investigating the starting modes of a 300 MW power generating unit with a TGMP-114 boiler and rated feedwater flowrate reduced to 20%
    Prokopenko, A.G.
    Mysak, I.S.
    Leonkov, A.M.
    Kuskov, I.A.
    Gerasimov, V.V.
    Zankovich, V.L.
    Zhadzilko, M.I.
    Miron, D.T.
    Thermal Engineering (English translation of Teploenergetika), 1988, 35 (05): : 270 - 273
  • [4] INVESTIGATION OF OPERATIONAL CONDITIONS OF A TGMP-114 BOILER OVER A WIDE-RANGE OF LOADS AT VARIABLE SUBCRITICAL PRESSURE OF MEDIUM
    BRITVIN, OV
    DIREKTOR, BY
    KALINICHEV, VM
    LOSHAK, SB
    UYUTOV, VV
    THERMAL ENGINEERING, 1972, 19 (10) : 28 - 31
  • [5] INVESTIGATING THE STARTING MODES OF A 300-MW POWER GENERATING-UNIT WITH A TGMP-114 BOILER AND RATED FEEDWATER FLOW-RATE REDUCED TO 20-PERCENT
    PROKOPENKO, AG
    MYSAK, IS
    LEONKOV, AM
    KUSKOV, IA
    GERASIMOV, VV
    ZANKOVICH, VL
    ZHADZILKO, MI
    MIRON, DT
    THERMAL ENGINEERING, 1988, 35 (05) : 270 - 273
  • [6] Tests of a 300-MW two-boiler single-turbine power unit with a TGMP-114 boiler when starting with a sliding pressure throughout the water-steam circuit
    Glusker, B.N.
    Kalinitchev, V.M.
    Shcheptev, V.A.
    Garnov, G.V.
    Taran, O.E.
    Platov, A.I.
    Thermal Engineering (English translation of Teploenergetika), 1997, 44 (12):
  • [7] Tests of a 300-MW Two-Boiler Single-Turbine Power Unit with a TGMP-114 Boiler when Starting with a Sliding Pressure Throughout the Water-Steam Circuit
    Entpr. Pwr. Stn. Maintenance, Kostromskya District Power Station, Semenovskii per. 15, Moscow 105023, Russia
    Therm Eng, 12 (1028-1033):
  • [8] An exploratory study of the variable-pressure operation of an UP-type once-through boiler for a 300MW unit
    College of Mechanical Engineering, Shanghai Univ. of Eng./Technology, Shanghai, Post Code: 200336, China
    Reneng Dongli Gongcheng/Journal of Engineering for Thermal Energy and Power, 2002, 17 (05): : 521 - 523
  • [9] INVESTIGATION AND INTRODUCTION OF OPERATION AT VARYING PRESSURE ON THE TGMP-204 BOILER OF AN 800MW GENERATING-UNIT
    GLUSKER, BN
    MYSAK, IS
    BOTVINOV, VP
    KASHCHUK, AD
    ZHELUNITSYN, OI
    THERMAL ENGINEERING, 1983, 30 (05) : 258 - 263
  • [10] INVESTIGATION AND INTRODUCTION OF OPERATING MODES AT VARIABLE PRESSURE IN THE TGMP-1202 BOILER OF A 1200MW GENERATING UNIT.
    All-Union Heat Engineering Inst, USSR, All-Union Heat Engineering Inst, USSR
    Therm Eng, 1985, 6 (313-318):