共 50 条
- [1] PRINCIPLES OF NUCLEAR-POWER STATION CONTROL JOURNAL OF THE BRITISH NUCLEAR ENERGY SOCIETY, 1976, 15 (03): : 225 - 236
- [2] TRAINING OF ENGINEERS FOR NUCLEAR POWER STATION OPERATION. Nuclear Energy, 1980, 19 (02): : 105 - 109
- [3] Failure Analysis and Overall Maintenance of Recirculation Cooling Water System Heat Exchanger of Third Qinshan Nuclear Power Plant Hedongli Gongcheng, 4 (112-115):
- [4] DATA LOGGING SYSTEM AT HUNTERSTON B NUCLEAR-POWER STATION MEASUREMENT AND CONTROL, 1979, 12 (04): : 137 - 140
- [8] Experience with the Operation of Water-cooled Generators at Biblis Nuclear Power Station. VGB-Kraftwerkstechnik, 1982, 62 (03): : 220 - 223
- [9] Forecast dilution or boration value during power changing process in Qinshan Project II Hedongli Gongcheng/Nuclear Power Engineering, 2010, 31 (06): : 96 - 101