On construction preparation and operation management mode of Jiangya Power Station

被引:0
|
作者
Xie, Jun-guang
机构
来源
Renmin Changjiang/Yangtze River | 2000年 / 31卷 / 02期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [31] Experience of the application and operation of 'KRUIZ' and SCADA TRACE MODE 5.07 on the thermal power station Nassiria
    Volkov, V.V.
    Nesterova, G.N.
    Pribory i Sistemy Upravleniya, 2002, (01): : 40 - 43
  • [32] Present problems in power station construction
    Munzinger, F
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1931, 75 : 505 - 510
  • [33] The power station construction in North America
    不详
    BAUINGENIEUR, 2008, 83 : A23 - A23
  • [34] Ecology and Power Station Construction.
    Schimunek, K.
    OZE, Oesterreichische Zeitschrift fuer Elektrizitaetswirtschaft, 1984, 37 (5-6): : 150 - 152
  • [35] Investigation on the construction mode of the charging station and battery-exchange station
    Liu Yongxiang
    Hui Fuhui
    Xu Ruilin
    Chen Tao
    Xu Xin
    Li Jie
    2011 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2011,
  • [36] Mechanism of uplift deformation of the Dam foundation of Jiangya water power station, Hunan Province, PR China
    Faquan, W
    Shengwen, Q
    Hengxing, L
    HYDROGEOLOGY JOURNAL, 2005, 13 (03) : 451 - 466
  • [37] UNDERGROUND STORAGE STATION LESUM - EXPERIENCES IN CONSTRUCTION AND OPERATION
    LECHLER, S
    ERDOL & KOHLE ERDGAS PETROCHEMIE, 1973, 26 (11): : 669 - 669
  • [38] Construction of Ieodo Ocean research station and its operation
    Shim, JS
    Chun, IS
    Min, IK
    PROCEEDINGS OF THE FOURTEENTH (2004) INTERNATIONAL OFFSHORE AND POLAR ENGINEERING CONFERENCE, VOL 2, 2004, : 351 - 357
  • [39] TELECOMMUNICATION EQUIPMENT FOR POWER-STATION OPERATION
    MAGNUS, CS
    OLSEN, T
    ERICSSON REVIEW, 1975, 52 (01): : 24 - 35
  • [40] THE EMSLAND NUCLEAR-POWER STATION IS IN OPERATION
    RUSSE, P
    VOLLRATH, R
    ATOMWIRTSCHAFT-ATOMTECHNIK, 1988, 33 (10): : 484 - 493