共 50 条
- [1] Management of high voltage cable laying for Jiangya Power Station Renmin Changjiang/Yangtze River, 2000, 31 (02):
- [2] Contract management for procurement of turbo generator sets for Jiangya Power Station Renmin Changjiang/Yangtze River, 2000, 31 (02): : 39 - 40
- [3] On construction archives management of Jiangya project 2000, Renmin Changjiang, Wuhan, China (31):
- [5] Operation Mode and Economic Analysis of Concentrating Solar Power Station 2019 4TH INTERNATIONAL CONFERENCE ON INTELLIGENT GREEN BUILDING AND SMART GRID (IGBSG 2019), 2019, : 751 - 755
- [6] Research on the Construction and Operation Mode of Electric Vehicle Charging Station in China 2ND INTERNATIONAL CONFERENCE ON EDUCATION, MANAGEMENT AND SYSTEMS ENGINEERING (EMSE 2017), 2017, : 317 - 320
- [7] Economic Analysis of the Integrated Operation Mode of Nuclear Power Station and Pumped-storage Power Station PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE ON HUMANITIES AND SOCIAL SCIENCE (HSS 2016), 2016, 33 : 684 - 690
- [9] ENVIRONMENTAL CONSIDERATIONS IN SITING, CONSTRUCTION, AND OPERATION OF A NUCLEAR-POWER STATION TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1975, 21 : 15 - 15
- [10] Considerations on the Operation & Management of a Modern Wind Turbine Power Station 2008 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, VOLS 1-11, 2008, : 680 - 686