Downtime of the service station in M/G/1 queueing system with repairable service station

被引:0
|
作者
Univ of Electronic Science and, Technology of China, Chengdu, China [1 ]
机构
来源
Microelectron Reliab | / 2卷 / 199-202期
关键词
* This work was supported by the National Nature Science Foundation of China Contract 79270082;
D O I
暂无
中图分类号
学科分类号
摘要
7
引用
收藏
相关论文
共 50 条
  • [1] Downtime of the service station in M/G/1 queueing system with repairable service station
    Tang, YH
    MICROELECTRONICS AND RELIABILITY, 1996, 36 (02): : 199 - 202
  • [2] A geometric process model for M/M/1 queueing system with a repairable service station
    Lam, Y
    Zhang, YL
    Liu, Q
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 168 (01) : 100 - 121
  • [3] Some reliability problems arising in M/G/1 queueing system with repairable service station and server vacations
    Tang, Yinghui
    Tang, Xiaowo
    Chinese Journal of Electronics, 1999, 8 (04): : 385 - 390
  • [4] Reliability analysis of a M-1(X1), M-2(X2)/G(1), G(2)/1 queueing system with a repairable service station
    Yue, DQ
    Cao, JH
    MICROELECTRONICS AND RELIABILITY, 1997, 37 (08): : 1225 - 1231
  • [5] RELIABILITY-ANALYSIS OF M/G/1 QUEUING SYSTEM WITH REPAIRABLE SERVICE STATION OF RELIABILITY SERIES STRUCTURE
    CAO, JH
    MICROELECTRONICS AND RELIABILITY, 1994, 34 (04): : 721 - 725
  • [6] On a repairable system with an unreliable service station - Bayesian approach
    Ke, Jau-Chuan
    Lee, Ssu-Lang
    Hsu, Ying-Lin
    Chen, Yu-Tzu
    COMPUTERS & MATHEMATICS WITH APPLICATIONS, 2008, 56 (07) : 1668 - 1683
  • [7] Standby system with imperfect coverage and repairable service station
    Hsu Y.-L.
    Tseng Y.-C.
    Chang C.-J.
    Chang F.-M.
    Chang, Chia-Jung (adeline@nutc.edu.tw), 2016, Tamkang University (27): : 299 - 316
  • [8] SOME RELIABILITY PROBLEMS ARISING IN GI/G/1 QUEUING SYSTEM WITH REPAIRABLE SERVICE STATION
    TANG, YH
    MICROELECTRONICS AND RELIABILITY, 1995, 35 (04): : 707 - 712
  • [9] Analysis of M/M/1/N working vacation queuing system with setup times and repairable service station
    Li S.-P.
    Yang X.-J.
    Peng D.
    Chen J.-S.
    Kongzhi yu Juece/Control and Decision, 2020, 35 (02): : 319 - 328
  • [10] Availability Evaluation of Machine Repairable System with Service Station Breakdowns
    Li Jingbo
    Lv Shengli
    Xiao Xin
    2011 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-6, 2011, : 2319 - +