Study n repeated joint grouting of RCC arch dam in laboratory

被引:0
|
作者
Chen, Gaixin
Huang, Guoxing
Ji, Guojin
机构
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:76 / 80
相关论文
共 50 条
  • [32] RCC Arch Dam Structure on the Taxi River and Water Storage Measure During Construction
    刘光廷
    李鹏辉
    胡昱
    张富德
    谢树南
    TsinghuaScienceandTechnology, 2002, (03) : 243 - 250
  • [33] Effect of artificial short joints on stress relaxation and cracking control in RCC arch dam
    Liu, Guang-Ting
    Xie, Shu-Nan
    Li, Peng-Hui
    Zhang, Fu-De
    2002, China Water Power Press
  • [34] Aseismic safety research on RCC gravity dam with incised transverse joint
    Huang Yi-sheng
    Chang Xiao-lin
    Li Jian-lin
    ROCK AND SOIL MECHANICS, 2008, 29 : 47 - 51
  • [35] Foundation grouting times and uplift control of the Baihetan super-high arch dam
    Wei P.
    Lin P.
    Wang Z.
    Wang K.
    Huang J.
    Qinghua Daxue Xuebao/Journal of Tsinghua University, 2020, 60 (07): : 557 - 565
  • [36] Harmonic thermal fracture of multiple crack system and the stability of cracks in RCC arch dam
    Zhang, GX
    Liu, GT
    Wu, Y
    ENGINEERING FRACTURE MECHANICS, 1996, 54 (05) : 653 - 665
  • [38] Study on seismic safety evaluation index of the high arch dam : A case study of Baihetan Arch Dam
    Qin L.
    Chen J.
    Xu Q.
    Li J.
    Shuili Xuebao/Journal of Hydraulic Engineering, 2022, 53 (09): : 1116 - 1126
  • [39] Three-dimensional joint opening analysis of an arch dam
    Ahmadi, M.T.
    Razavi, S.
    Computers and Structures, 1992, 44 (1-2): : 187 - 192
  • [40] A 3-DIMENSIONAL JOINT OPENING ANALYSIS OF AN ARCH DAM
    AHMADI, MT
    RAZAVI, S
    COMPUTERS & STRUCTURES, 1992, 44 (1-2) : 187 - 192