共 50 条
[46]
Simultaneous resource scheduling with batching to minimize weighted flow times
[J].
IIE Trans,
5 (587-598)
[50]
Solving a Malleable Jobs Scheduling Problem to Minimize Total Weighted Completion Times by Mixed Integer Linear Programming Models
[J].
Intelligent Information and Database Systems, ACIIDS 2016, Pt II,
2016, 9622
:286-295