Scheduling to minimize the weighted sum of completion times

被引:0
作者
Zhao, Chuan-Li [1 ]
Zhang, Qing-Ling [1 ]
Tang, Heng-Yong [2 ]
机构
[1] Sch. of Sci., Northeastern Univ., Shenyang 110004, China
[2] Dept. of Math., Shenyang Normal Univ., Shenyang 110034, China
来源
Dongbei Daxue Xuebao/Journal of Northeastern University | 2003年 / 24卷 / 06期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
Scheduling
引用
收藏
页码:515 / 518
相关论文
共 50 条
[21]   Heuristics for the single machine weighted sum of completion times scheduling problem with periodic maintenance [J].
Hanane Krim ;
Rachid Benmansour ;
David Duvivier ;
Daoud Aït-Kadi ;
Said Hanafi .
Computational Optimization and Applications, 2020, 75 :291-320
[22]   Single machine scheduling problem with interval processing times to minimize mean weighted completion time [J].
Allahverdi, Ali ;
Aydilek, Harun ;
Aydilek, Asiye .
COMPUTERS & OPERATIONS RESEARCH, 2014, 51 :200-207
[23]   Scheduling with Rejection to Minimize the Total Weighted Completion Time [J].
Zhang, Shu-Xia ;
Cao, Zhi-Gang ;
Zhang, Yu-Zhong .
OPERATIONS RESEARCH AND ITS APPLICATIONS, PROCEEDINGS, 2009, 10 :111-+
[24]   Scheduling to minimize the sum of weighted flowtime and weighted tardiness of jobs in a flowshop with sequence-dependent setup times [J].
Rajendran, C ;
Ziegler, H .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 149 (03) :513-522
[25]   OPERATION RESEARCH STATISTICS AND ECONOMICS .286. OPENSHOP AND FLOWSHOP SCHEDULING TO MINIMIZE SUM OF COMPLETION TIMES [J].
ADIRI, I ;
AMIT, N .
COMPUTERS & OPERATIONS RESEARCH, 1984, 11 (03) :275-284
[26]   MINIMIZING THE SUM OF WEIGHTED COMPLETION TIMES WITH UNRESTRICTED WEIGHTS [J].
DELLAMICO, M ;
MARTELLO, S ;
VIGO, D .
DISCRETE APPLIED MATHEMATICS, 1995, 63 (01) :25-41
[27]   A flowshop scheduling algorithm to minimize total weighted completion time [J].
Zhao, CL ;
Zhang, QL ;
Tang, HY .
PROCEEDINGS OF THE 4TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-4, 2002, :1485-1488
[28]   Customer order scheduling to minimize total weighted completion time [J].
Wang, Guoqing ;
Cheng, T. C. Edwin .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2007, 35 (05) :623-626
[29]   Batch scheduling to minimize the sum of total completion time plus the sum of total penalties [J].
Li, Xiuqian ;
Feng, Haodi ;
Su, Zheng .
Jisuanji Yanjiu yu Fazhan/Computer Research and Development, 2013, 50 (08) :1700-1709
[30]   SIMULTANEOUS RESOURCE SCHEDULING TO MINIMIZE WEIGHTED FLOW TIMES [J].
DOBSON, G ;
KARMARKAR, US .
OPERATIONS RESEARCH, 1989, 37 (04) :592-600