Scheduling to minimize the weighted sum of completion times

被引:0
作者
Zhao, Chuan-Li [1 ]
Zhang, Qing-Ling [1 ]
Tang, Heng-Yong [2 ]
机构
[1] Sch. of Sci., Northeastern Univ., Shenyang 110004, China
[2] Dept. of Math., Shenyang Normal Univ., Shenyang 110034, China
来源
Dongbei Daxue Xuebao/Journal of Northeastern University | 2003年 / 24卷 / 06期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
Scheduling
引用
收藏
页码:515 / 518
相关论文
共 50 条
[1]   SCHEDULING TO MINIMIZE WEIGHTED SUM OF COMPLETION TIMES WITH SECONDARY CRITERIA [J].
BURNS, RN .
NAVAL RESEARCH LOGISTICS, 1976, 23 (01) :125-129
[2]   Precedence constrained scheduling to minimize sum of weighted completion times on a single machine [J].
Chekuri, C ;
Motwani, R .
DISCRETE APPLIED MATHEMATICS, 1999, 98 (1-2) :29-38
[3]   Single-machine scheduling with an availability constraint to minimize the weighted sum of the completion times [J].
Kacem, Imed ;
Chu, Chengbin ;
Souissi, Ahmed .
COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (03) :827-844
[4]   Permutation flowshop scheduling problems with time lags to minimize the weighted sum of machine completion times [J].
Fondrevelle, J. ;
Oulamara, A. ;
Portmann, M. -C. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 112 (01) :168-176
[5]   Scheduling Unit Jobs with a Common Deadline to Minimize the Sum of Weighted Completion Times and Rejection Penalties [J].
Domanic, Nevzat Onur ;
Plaxton, C. Gregory .
ALGORITHMS AND COMPUTATION, ISAAC 2014, 2014, 8889 :646-657
[6]   Scheduling of a two-stage differentiation flowshop to minimize weighted sum of machine completion times [J].
Cheng, T. C. E. ;
Lin, B. M. T. ;
Tian, Y. .
COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (11) :3031-3040
[7]   Parallel machine scheduling to minimize the sum of quadratic completion times [J].
Cheng, TCE ;
Liu, ZH .
IIE TRANSACTIONS, 2004, 36 (01) :11-17
[8]   SCHEDULING TO MINIMIZE THE TOTAL RESOURCE CONSUMPTION WITH A CONSTRAINT ON THE SUM OF COMPLETION TIMES [J].
LI, CL .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 80 (02) :381-388
[9]   Scheduling to minimize the total resource consumption with a constraint on the sum of completion times [J].
Washington Univ, St Louis, United States .
Eur J Oper Res, 2 (381-388)