共 50 条
- [5] ASSESSMENT OF THE TECHNOLOGICAL CAPABILITIES OF THE CANADIAN FOUNDRY INDUSTRY. CANMET Report (Canada Centre for Mineral and Energy Technology), 1979, (79-24):
- [10] SCHEDULING OF SHIFTWORK IN INDUSTRY. Production and Inventory Management Journal, 1982, V 23 (N 3): : 74 - 86