Project scheduling risk assessment using Monte Carlo methods

被引:0
作者
Finley, E.D. [1 ]
Fisher, D.J. [1 ]
机构
[1] Bechtel, Inc
来源
Cost Engineering (Morgantown, West Virginia) | 1994年 / 36卷 / 10期
关键词
Scheduling;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:26 / 28
相关论文
共 50 条
[41]   Developing an electronic acquisition model for project scheduling using XML-based information standard [J].
Tserng, HP ;
Lin, WY .
AUTOMATION IN CONSTRUCTION, 2003, 12 (01) :67-95
[42]   Using an Enhanced Ant Colony System to Solve Resource-Constrained Project Scheduling Problem [J].
Chen, Ruey-Maw ;
Lo, Shih-Tang .
INTERNATIONAL JOURNAL OF COMPUTER SCIENCE AND NETWORK SECURITY, 2006, 6 (11) :75-84
[43]   Investment Decision for Long-Term Battery Energy Storage System Using Least Squares Monte Carlo [J].
Shin, Kyungcheol ;
Lee, Jinyeong .
ENERGIES, 2024, 17 (09)
[44]   The embedded software of an electricity meter: An experience in using formal methods in an industrial project [J].
Arnold, A ;
Begay, D ;
Radoux, JP .
SCIENCE OF COMPUTER PROGRAMMING, 1997, 28 (2-3) :93-110
[45]   Comparing Schedule Generation Schemes in Resource-Constrained Project Scheduling Using Elitist Genetic Algorithm [J].
Kim, Jin-Lee ;
Ellis, Ralph D., Jr. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2010, 136 (02) :160-169
[46]   Enabling astronaut self-scheduling using a robust advanced modelling and scheduling system: An assessment during a Mars analogue mission [J].
St-Guillain, Michael ;
Vanderdonckt, Jean ;
Burny, Nicolas ;
Pletser, Vladimir ;
Vaquero, Tiago ;
Chien, Steve ;
Karl, Alexander ;
Marquez, Jessica ;
Wain, Cyril ;
Comein, Audrey ;
Casla, Ignacio S. ;
Jacobs, Jean ;
Meert, Julien ;
Chamart, Cheyenne ;
Drouet, Sirga ;
Manon, Julie .
ADVANCES IN SPACE RESEARCH, 2023, 72 (04) :1378-1398
[47]   Flow shop scheduling with blocking using modified harmony search algorithm with neighboring heuristics methods [J].
Abu Doush, Iyad ;
Al-Betar, Mohammed Azmi ;
Awadallah, Mohammed A. ;
Santos, Eugene ;
Hammouri, Abdelaziz, I ;
Mafarjeh, Majdi ;
AlMeraj, Zainab .
APPLIED SOFT COMPUTING, 2019, 85
[48]   Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem [J].
Van Peteghem, Vincent ;
Vanhoucke, Mario .
JOURNAL OF HEURISTICS, 2011, 17 (06) :705-728
[49]   Construction Planning and Scheduling of a Renovation Project Using BIM-Based Multi-Objective Genetic Algorithm [J].
Nusen, Pornpote ;
Boonyung, Wanarut ;
Nusen, Sunita ;
Panuwatwanich, Kriengsak ;
Champrasert, Paskorn ;
Kaewmoracharoen, Manop .
APPLIED SCIENCES-BASEL, 2021, 11 (11)
[50]   Construction Project Scheduling with Time, Cost, and Material Restrictions Using Fuzzy Mathematical Models and Critical Path Method [J].
Castro-Lacouture, Daniel ;
Suer, Gursel A. ;
Gonzalez-Joaqui, Julian ;
Yates, J. K. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2009, 135 (10) :1096-1104