Project scheduling risk assessment using Monte Carlo methods

被引:0
作者
Finley, E.D. [1 ]
Fisher, D.J. [1 ]
机构
[1] Bechtel, Inc
来源
Cost Engineering (Morgantown, West Virginia) | 1994年 / 36卷 / 10期
关键词
Scheduling;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:26 / 28
相关论文
共 50 条
[31]   Self-adjusting multi-objective scheduling based on Monte Carlo Tree Search for matrix production assembly systems [J].
Stricker, Nicole ;
Kuhnle, Andreas ;
Hofmann, Constantin ;
Deininger, Patrick .
CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2021, 70 (01) :381-384
[32]   Experimental study of scheduling with memory constraints using hybrid methods [J].
Berlinska, J. ;
Drozdowski, M. ;
Lawenda, M. .
JOURNAL OF COMPUTATIONAL AND APPLIED MATHEMATICS, 2009, 232 (02) :638-654
[33]   Solving Transport Infrastructure Investment Project Selection and Scheduling Using Genetic Algorithms [J].
Jecmen, Karel ;
Mockova, Denisa ;
Teichmann, Dusan .
MATHEMATICS, 2024, 12 (19)
[34]   Control Risk for Multimode Resource-Constrained Project Scheduling Problems under Hybrid Uncertainty [J].
Gan, Lu ;
Xu, Jiuping .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2015, 31 (03)
[35]   A Comparison of Centralised and Decentralised Scheduling Methods Using a Simple Benchmark System [J].
Tochev, E. ;
Pfifer, H. ;
Ratchev, S. .
IFAC PAPERSONLINE, 2018, 51 (11) :1287-1292
[36]   Scheduling Optimization Using an Adapted Genetic Algorithm with Due Regard for Random Project Interruptions [J].
Alekseytsev, Anatoly V. ;
Nadirov, Sodiqjon H. .
BUILDINGS, 2022, 12 (12)
[37]   SOFTWARE PROJECT SCHEDULING USING THE HYPER-CUBE ANT COLONY OPTIMIZATION ALGORITHM [J].
Crawford, Broderick ;
Soto, Ricardo ;
Johnson, Franklin ;
Misra, Sanjay ;
Paredes, Fernando ;
Olguin, Eduardo .
TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2015, 22 (05) :1171-1178
[38]   Solving Logistics Scheduling Problems Using an Extended Many-Project Optimization Model [J].
Mihaly, Krisztian ;
Forrai, Monika Kulcsarne ;
Kulcsar, Gyula .
ADVANCES IN DIGITAL LOGISTICS, LOGISTICS AND SUSTAINABILITY, CECOL 2024, 2024, :115-144
[39]   Hybrid methods using genetic algorithm approach for crude distillation unit scheduling [J].
Dave, D ;
Zhang, N .
PROCESS SYSTEMS ENGINEERING 2003, PTS A AND B, 2003, 15 :445-450
[40]   Learning-based scheduling of flexible manufacturing systems using ensemble methods [J].
Priore, Paolo ;
Ponte, Borja ;
Puente, Javier ;
Gomez, Alberto .
COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 126 :282-291