Project scheduling risk assessment using Monte Carlo methods

被引:0
作者
Finley, E.D. [1 ]
Fisher, D.J. [1 ]
机构
[1] Bechtel, Inc
来源
Cost Engineering (Morgantown, West Virginia) | 1994年 / 36卷 / 10期
关键词
Scheduling;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:26 / 28
相关论文
共 50 条
[11]   Research on scheduling Model of Maintenance Support Force based on Monte Carlo Method [J].
Li Xiang ;
Zhang Liu ;
Lv Fenghua .
MANAGEMENT, MANUFACTURING AND MATERIALS ENGINEERING, PTS 1 AND 2, 2012, 452-453 :838-+
[12]   New Grid Scheduling and Rescheduling Methods in the GrADS Project [J].
F. Berman ;
H. Casanova ;
A Chien ;
K. Cooper ;
H. Dail ;
A. Dasgupta ;
W. Deng ;
J. Dongarra ;
L. Johnsson ;
K. Kennedy ;
C. Koelbel ;
B. Liu ;
X. Liu ;
A. Mandal ;
G. Marin ;
M. Mazina ;
J. Mellor-Crummey ;
C. Mendes ;
A. Olugbile ;
M. Patel ;
D. Reed ;
Z. Shi ;
O. Sievert ;
H. Xia ;
A. YarKhan .
International Journal of Parallel Programming, 2005, 33 :209-229
[13]   New grid scheduling and rescheduling methods in the GrADS Project [J].
Berman, F ;
Casanova, H ;
Chien, A ;
Cooper, K ;
Dail, H ;
Dasgupta, A ;
Deng, W ;
Dongarra, J ;
Johnsson, L ;
Kennedy, K ;
Koelbel, C ;
Liu, B ;
Liu, X ;
Mandal, A ;
Marin, G ;
Mazina, M ;
Mellor-Crummey, J ;
Mendes, C ;
Olugbile, A ;
Patel, M ;
Reed, D ;
Shi, Z ;
Sievert, O ;
Xia, H ;
YarKhan, A .
INTERNATIONAL JOURNAL OF PARALLEL PROGRAMMING, 2005, 33 (2-3) :209-229
[14]   Probability of project completion using stochastic project scheduling simulation [J].
Lee, DE .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2005, 131 (03) :310-318
[15]   A Markov Chain Monte Carlo Approach to Cost Matrix Generation for Scheduling Performance Evaluation [J].
Canon, Louis-Claude ;
El Sayah, Mohamad ;
Heam, Pierre-Cyrille .
PROCEEDINGS 2018 INTERNATIONAL CONFERENCE ON HIGH PERFORMANCE COMPUTING & SIMULATION (HPCS), 2018, :460-467
[16]   Simulating the potential effect of risk management on project scheduling [J].
Suri, P.K. ;
Soni, Rachna .
Information Technology Journal, 2007, 6 (01) :8-13
[17]   Using a risk-based approach to project scheduling: A case illustration from semiconductor manufacturing [J].
Zafra-Cabeza, Ascension ;
Ridao, Miguel A. ;
Camacho, Eduardo F. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 190 (03) :708-723
[18]   Project scheduling using a competitive genetic algorithm [J].
Magalhaes-Mendes, J. .
SMO 08: PROCEEDINGS OF THE 8TH WSEAS INTERNATIONAL CONFERENCE ON SIMULATION, MODELLING AND OPTIMIZATION, 2008, :39-+
[19]   SETS: Stochastic Execution Time Scheduling for Multicore Systems by Joint State Space and Monte Carlo [J].
Iqbal, Nabeel ;
Henkel, Joerg .
2010 IEEE AND ACM INTERNATIONAL CONFERENCE ON COMPUTER-AIDED DESIGN (ICCAD), 2010, :123-130
[20]   Petri net-based project scheduling methods: Advantages and shortcomings [J].
Kirytopoulos, Konstantinos ;
Diamantas, Viktor ;
Leopoulos, Vrassidas ;
Dimadis, Christos .
MODELLING AND SIMULATION 2006, 2006, :335-+