共 50 条
- [41] Two-machine flowshop scheduling to minimize total completion time with separate setup and removal times INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2002, 9 (03): : 275 - 286
- [42] Modeling and scheduling open shops with sequence-dependent setup times to minimize total completion time The International Journal of Advanced Manufacturing Technology, 2011, 53 : 751 - 760
- [46] Customer order scheduling to minimize total weighted completion time OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2007, 35 (05): : 623 - 626
- [47] A flowshop scheduling algorithm to minimize total weighted completion time PROCEEDINGS OF THE 4TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-4, 2002, : 1485 - 1488